|
|
| No. 115 - Routine Operations |
| Report for Period 20 January to 26 January 2008 Routine activities were carried out during the reporting period. |
| Date: 29 Jan 2008 |
|
|
| No. 114 - Routine Operations |
| Report for Period 13 January to 19 January 2008 Routine activities were carried out during the reporting period. |
| Date: 22 Jan 2008 |
|
|
| No. 93 - 4th Solar Orbit |
| Report for Period 22 December 2007 to 18 January 2008 Rosetta is continuing its 4th orbit around the Sun as part of its interplanetary journey. The
spacecraft distance from the Sun will now increase to reach a maximum of ca. 2.26 AU in December 2008. |
| Date: 22 Jan 2008 |
|
|
| Ulysses Communication Anomaly |
| Early on 15 January, at the start of a routine test in preparation for the next phase of the Ulysses mission, communication with the spacecraft via the onboard X-band transmitter was lost. As a result, the Spacecraft Operations Team declared a Spacecraft Emergency in order to obtain additional ground station coverage from NASA's Deep Space Network (DSN). |
| Date: 17 Jan 2008 |
|
|
| No. 113 - Routine Operations |
| Report for Period 06 January to 12 January 2008 Routine activities were carried out during the reporting period. |
| Date: 15 Jan 2008 |
|
|
| No. 112 - Routine Operations |
| Report for Period 30 December 2007 to 05 January 2008 Routine activities were carried out during the reporting period. |
| Date: 08 Jan 2008 |
|
|
| No. 111 - Routine Operations |
| Report for Period 23 December to 29 December 2007 It took several days to download the VIRTIS data stored onboard the spacecraft after the problems at Cebreros reported in the previous week.
|
| Date: 02 Jan 2008 |
|
|