| No. 119 - Payload check-out 10 |
Report for Period 19 September to 25 September 2009
The reporting period covers the first week of the payload check-out 10 (PC10). The spacecraft activities were conducted according to plan. Instruments are being activated, tested, and calibrated and software updated as planned. Both the spacecraft and the ground segment are behaving nominally. |
| Date: 30 Sep 2009 |
|
|
| No. 202 - Mission Operations Update |
Report for Period 20 September to 26 September 2009 The Venus Express spacecraft and instruments performed nominally during this week. |
| Date: 30 Sep 2009 |
|
|
| No. 118 - Start of payload check-out 10 |
Report for Period 22 August to 18 September 2009
The reporting period covers four weeks of operations during which the spacecraft was reconfigured from passive to active cruise mode, following the exit out of Near Sun Hibernation Mode (NSHM) on DOY251. With the mission's last planned near Sun hibernation phase completed, the spacecraft activities immediately focussed on the execution of the tenth spacecraft check-out (SC10). This included a characterisation of the inertia matrix and of the Sun sensors at large offset angles. |
| Date: 23 Sep 2009 |
|
|
| No. 201 - End of Earth Occultation Season #7 |
Report for Period 13 September to 19 September 2009 The Venus Express spacecraft and instruments performed nominally during this week. The seventh Earth occultation season concluded this week, with the last five observations in the series carried out in this reporting period. |
| Date: 23 Sep 2009 |
|
|
| No. 200 - Earth Occultation Season #7 |
Report for Period 6 September to 12 September 2009 The Venus Express spacecraft and instruments performed nominally during this week. The seventh Earth occultation season is ongoing, with three observations carried out in this reporting period. |
| Date: 16 Sep 2009 |
|
|
| No. 199 - Earth Occultation Season #7 |
Report for Period 30 August to 5 September 2009 The Venus Express spacecraft and instruments performed nominally during this week. The seventh Earth occultation season is ongoing, with five observations carried out in this reporting period. |
| Date: 09 Sep 2009 |
|
|
| No. 198 - Earth Occultation Season #7 |
Report for Period 23 August to 29 August 2009 The Venus Express spacecraft and instruments performed nominally during this week. The seventh Earth occultation season is ongoing, with three observations carried out in this reporting period. |
| Date: 02 Sep 2009 |
|
|