• → European Space Agency

    • About Science & Technology

    • For Public

    • For Educators

    • ESA

    • Science & Technology

    • Services

    • Missions
    • Show All Missions
    • Archives
    • News Archive
    • Science Results
    • Multimedia Gallery
    • Publication Archive
    • Status Report Archive
    • Journal Archive
    • Calendar of Events
    • Services
    • Contact Us
    • Subscribe
    • Terms and Conditions
    • Bookmark and Share

    Status Report Archive

    Search Results:

      | 1 |   [Refine Search]
    5 items found  page 1 of 1
    No. 136 - End of Conjunction Phase Operations

    Report for Period 15 June to 21 June 2008

    The reporting period covered the last days of solar conjunction phase operations (ending on 19 June), the reconfiguration of the solid state mass memory (SSMM) and the resume of science activities. Commanding tests and recording of open loop data continued until the exit from the conjunction phase.

    Date: 24 Jun 2008
    No. 135 - Conjunction Phase Operations
    Report for Period 8 June to 14 June 2008

    The reporting period covered conjunction phase operations. During this phase, groundstation pass operations are reduced: no science activities are carried out, no solid state mass memory (SSMM) dumping takes place.

    Date: 17 Jun 2008
    No. 98 - Passive Cruise

    Report for Period 10 May to 6 June 2008

    Rosetta is continuing its fourth orbit around the Sun as part of its interplanetary journey. The spacecraft distance from the Sun will now increase to reach a maximum of about 2.26 AU in December 2008.

    Date: 10 Jun 2008
    No. 134 - Conjunction Phase Operations

    Report for Period 1 June to 7 June 2008

    The reporting period covered conjunction phase operations. During this phase, groundstation pass operations are reduced: no science activities are carried out, no solid state mass memory (SSMM) dumping takes place.

    Date: 10 Jun 2008
    No. 133 - Start of Conjunction Phase Operations

    Report for Period 25 May to 31 May 2008

    Operations have been nominal during the reporting period. The conjunction operations started on 30 May.

    Date: 03 Jun 2008
     
      | 1 |   [Refine Search]
    5 items found  page 1 of 1
     


    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • Google Buzz
    • Livestream
    • Subscribe
    • App Store
    • ESA Science Twitter

    Follow ESA science

    • Copyright 2000 - 2013 © European Space Agency. All rights reserved.

    • Terms and Conditions