• → European Space Agency

    • About Science & Technology

    • For Public

    • For Educators

    • ESA

    • Science & Technology

    • Services

    • Missions
    • Show All Missions
    • Archives
    • News Archive
    • Science Results
    • Multimedia Gallery
    • Publication Archive
    • Status Report Archive
    • Journal Archive
    • Calendar of Events
    • Services
    • Contact Us
    • Subscribe
    • Terms and Conditions
    • Bookmark and Share

    Status Report Archive

    Search Results:

      | 1 |   [Refine Search]
    7 items found  page 1 of 1
    No. 141 - Second Pericentre Lowering Manoeuvre

    Report for Period 20 July to 26 July 2008

    All operations have been nominal during the reporting period. During this period the second pair of Orbit Control Manoeuvres (OCM) to reduce the pericentre altitude and to raise the apocentre altitude was executed. Planning of the third pair was performed and commands were uploaded to the spacecraft for execution during the next reporting period.

    Date: 29 Jul 2008
    No. 140 - First Pericentre Lowering Manoeuvre

    Report for Period 13 July to 19 July 2008

    All operations have been nominal during the reporting period. During this period the first pair of Orbit Control Manoeuvres (OCM) to reduce the pericentre altitude and to raise the apocentre altitude was executed. Planning of the second pair was performed and commands were uploaded to the spacecraft for execution during the next reporting period.

    Date: 22 Jul 2008
    No. 100 - Active Payload Check-out 8

    Report for Period 5 July to 18 July 2008

    During the reporting period the first two weeks of the active payload check-out 8 were executed, as well as the attitude and orbit control system (AOCS) check-out 8.

    Date: 22 Jul 2008
    No. 99 - Switch to Active Cruise Mode

    Report for Period 7 June to 4 July 2008

    On 1 July 2008, DoY 183, Rosetta was taken out of Near Sun Hibernation Mode (NSHM) and reconfigured to Active Cruise Mode in preparation of the asteroid Steins fly-by phase.

    Date: 21 Jul 2008
    No. 139 - Preparing for Pericentre Lowering Manoeuvres

    Report for Period 6 July to 12 July 2008

    All operations have been nominal during the reporting period.

    Between 13 July and 5 August 2008 a series of manoeuvres is performed to lower the pericentre altitude of Venus Express (see also the link on the right hand side for more details). The first pair of manoeuvres (one manoeuvre to raise the apocentre altitude and one to lower the pericentre altitude) was planned and uploaded to the spacecraft. The two manoeuvres will be executed during the next reporting period.

    Date: 15 Jul 2008
    No. 138 - Routine Operations

    Report for Period 29 June to 5 July 2008

    All operations have been nominal during the reporting period. The telecommunication (TC) bit rate has been increased to 2 kbps.

    Date: 09 Jul 2008
    No. 137 - Routine Operations

    Report for Period 22 June to 28 June 2008

    The reporting period was the first complete week of nominal science operations after the solar conjunction phase.

    Date: 02 Jul 2008
     
      | 1 |   [Refine Search]
    7 items found  page 1 of 1
     


    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • Google Buzz
    • Livestream
    • Subscribe
    • App Store
    • ESA Science Twitter

    Follow ESA science

    • Copyright 2000 - 2013 © European Space Agency. All rights reserved.

    • Terms and Conditions