• → European Space Agency

    • About Science & Technology

    • For Public

    • For Educators

    • ESA

    • Science & Technology

    • Services

    • Missions
    • Show All Missions
    • Archives
    • News Archive
    • Science Results
    • Multimedia Gallery
    • Publication Archive
    • Status Report Archive
    • Journal Archive
    • Calendar of Events
    • Services
    • Contact Us
    • Subscribe
    • Terms and Conditions
    • Bookmark and Share

    Status Report Archive

    Search Results:

      | 1 |   [Refine Search]
    5 items found  page 1 of 1
    No. 158 - Cebreros Refurbishment

    Report for Period 16 November to 22 November 2008

    This reporting period marks the beginning of the Cebreros ground station downtime, which will be out of operations until 1 December 2008 for refurbishment activities. The New Norcia ground station is used for routine communication with the spacecraft during the Cebreros downtime. At the same time, radio science investigation (RSI) occultation observations are also performed during certain New Norcia passes, combining this activity with the routine communication tasks.

    Date: 26 Nov 2008
    No. 157 - End of Eclipse Season

    Report for Period 9 November to 15 November 2008

    Nominal operations were conducted during the reporting period. The batteries have performed nominally during the eclipse season that started on 19 September and ended on 12 November 2008 (DOY 317). VIRTIS was only operated in the visual channels.

    Date: 19 Nov 2008
    No. 156 - Eclipse Season

    Report for Period 2 November to 8 November 2008

    Nominal operations were conducted during the reporting period. The batteries continue to perform nominally during the eclipse season that started on 19 September and will end on 11 November. VIRTIS was only operated in the visual channels.

    Date: 12 Nov 2008
    No. 107 - Mission Operations Update

    Report for Period 6 October to 31 October 2008

    The reporting period covers four weeks of active cruise phase. An investigation was performed of a problem that had occurred with the COSIMA instrument during the asteroid Steins fly-by, focussing on the instrument's Target Manipulation Unit (TMU).

    Date: 11 Nov 2008
    No. 155 - Eclipse Season

    Report for Period 26 October to 1 November 2008

    Nominal operations were conducted during the reporting period. The batteries continue to perform nominally during the eclipse season that started on 19 September and will end on 11 November.

    Date: 07 Nov 2008
     
      | 1 |   [Refine Search]
    5 items found  page 1 of 1
     


    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • Google Buzz
    • Livestream
    • Subscribe
    • App Store
    • ESA Science Twitter

    Follow ESA science

    • Copyright 2000 - 2013 © European Space Agency. All rights reserved.

    • Terms and Conditions