• → European Space Agency

    • About Science & Technology

    • For Public

    • For Educators

    • ESA

    • Science & Technology

    • Services

    • Missions
    • Show All Missions
    • Archives
    • News Archive
    • Science Results
    • Multimedia Gallery
    • Publication Archive
    • Status Report Archive
    • Journal Archive
    • Calendar of Events
    • Services
    • Contact Us
    • Subscribe
    • Terms and Conditions
    • Bookmark and Share

    Status Report Archive

    Search Results:

      | 1 |   [Refine Search]
    6 items found  page 1 of 1
    No. 133 - Start of payload check-out 12

    Report for Period 17 April to 23 April 2010

    The reporting period covers one week of Rosetta mission operations and saw the start of the spacecraft check-out 11 and the active payload check-out 12 (PC12).

    Date: 28 Apr 2010
    Herschel Status Report - April 2010

    Report for period 21 March to 21 April 2010

    Mission operations of the Herschel space observatory continued nominally during the reporting period, with the spacecraft and subsystems all performing as expected.

    Date: 26 Apr 2010
    No. 132 - Mission Operations Update

    Report for Period 27 March to 16 April 2010

    The reporting period covers three weeks of Rosetta mission operations. Few instrument tests were performed in preparation of the active payload check-out (PC12), which will start in the next reporting period. The MIRO instrument was activated on 6 April for a validation of new on-board control procedures (OBCP) that apply a software patch. The ultra-stable oscillator (USO) of the Radio Science Investigation (RSI) was un-muted for a short period of time on 14 April.

    Date: 21 Apr 2010
    Mars Express Status Report - March 2010

    Main events and Activities

    On 3 March, Mars Express performed the closest ever flyby of Phobos, the larger of the two Martian moons. The spacecraft passed Phobos at an altitude of about 67 kilometres. The flyby was part of the Phobos flyby campaign, which started on 16 February and concluded on 26 March. The campaign, with a total of twelve flybys, provided a unique opportunity for scientific investigations of the small moon. Near the end of the campaign, on 21 and 22 March, spacecraft manoeuvres changed the Mars Express orbit to its planned final 88:25 resonance. This orbit resonance is more favourable for Mars observations by the optical instruments over the next few years of the mission.

    Date: 08 Apr 2010
    No. 219 - Mission operations update
    Report for Period 28 February to 27 March 2010 (week 9 - week 12)

    The Venus Express spacecraft and instruments performed nominally during the reporting period. The atmospheric drag experiment (ADE) campaign #3a concluded on 28 February. On 20 March the regular DDOR measurements were performed. A solar array tilt experiment was carried out on 25 March around the pericentre passage.

    Date: 07 Apr 2010
    No. 131 - Asteroid Lutetia flyby test

    Report for Period 27 February to 26 March 2010

    The reporting period covers four weeks of Rosetta mission operations. These were dedicated to further payload maintenance activities and a rehearsal of the flyby of asteroid Lutetia. The rehearsal of the asteroid flyby dynamics went very smoothly and gives good confidence in the spacecraft behaviour for the actual flyby in July 2010.

    Date: 06 Apr 2010
     
      | 1 |   [Refine Search]
    6 items found  page 1 of 1
     


    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • Google Buzz
    • Livestream
    • Subscribe
    • App Store
    • ESA Science Twitter

    Follow ESA science

    • Copyright 2000 - 2013 © European Space Agency. All rights reserved.

    • Terms and Conditions