• → European Space Agency

    • About Science & Technology

    • For Public

    • For Educators

    • ESA

    • Science & Technology

    • Services

    • Missions
    • Show All Missions
    • Archives
    • News Archive
    • Science Results
    • Multimedia Gallery
    • Publication Archive
    • Status Report Archive
    • Journal Archive
    • Calendar of Events
    • Services
    • Contact Us
    • Subscribe
    • Terms and Conditions
    • Bookmark and Share

    Status Report Archive

    Search Results:

      | 1 |   [Refine Search]
    3 items found  page 1 of 1
    Herschel Status Report - July/August 2010

    Report for period 23 June to 23 August 2010

    Mission operations of the Herschel space observatory continued nominally during the reporting period, with the spacecraft and subsystems all performing as expected. The first Open Time (OT1) Call for non Key Programme observing proposals closed on 22 July 2010. A total of 576 proposals were received.

    Date: 30 Aug 2010
    No. 224 - Start of quadrature operations

    Report for Period 18 July to 14 August 2010 (week 29 - week 32)

    The reporting period, covering four weeks of Venus Express mission operations, was devoted to routine science activities. On 21 July the spacecraft entered a new quadrature phase that will last until 26 August. On 28 July a few anomalies were observed relating to the solid state mass memory (SSMM), which were solved by a warm restart of the SSMM. As part of the SSMM anomaly recovery a spacecraft safe mode was commanded on 30 July. After exit from the safe mode nominal operations were resumed. On 30 July another eclipse season started.

    Date: 18 Aug 2010
    No. 142 - Flyby data downlinking

    Report for the period 11 July to 30 July 2010

    This report covers 20 days of Rosetta mission operations. Payload operations associated with the flyby of asteroid Lutetia were completed on 11 July and the last three weeks have been mainly dedicated to downlinking the large volume of science data acquired. All the data have now been downlinked. The spacecraft is now cruising towards the aphelion of its current orbit, which will be reached in October 2012. Work to reconstruct the relative trajectory of the flyby is continuing.

    Date: 03 Aug 2010
     
      | 1 |   [Refine Search]
    3 items found  page 1 of 1
     


    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • Google Buzz
    • Livestream
    • Subscribe
    • App Store
    • ESA Science Twitter

    Follow ESA science

    • Copyright 2000 - 2013 © European Space Agency. All rights reserved.

    • Terms and Conditions