Mission operations of the Herschel space observatory continued nominally during the reporting period, with the spacecraft and subsystems all performing as expected.
Report for the period 25 January to 11 February 2011
This report covers 18 days of Rosetta mission operations. The main activities were delta differential one-way ranging (DDOR) to determine the outcome of the burns performed during the previous reporting period as part of the first rendezvous manoeuvre (RDVM#1), and an attempt to perform the TRIM1 burn.
Report for the period 2 January to 29 January 2011 (week 1 - week 4)
The reporting period, covering four weeks of Venus Express mission operations, was devoted to routine science activities. Nine occultations were observed for Radio Science Investigations campaign #10.