| No. 156 - Preparations for deep-space hibernation phase |
Report for the period 18 April to 15 May 2011
This report covers 28 days of Rosetta mission operations. The main activities were further preparations for the deep space hibernation phase. |
| Date: 31 May 2011 |
|
|
| Herschel Status Report - May 2011 |
Report for period 15 April to 17 May 2011 Mission operations of the Herschel space observatory continued nominally during the reporting period, with the spacecraft and subsystems all performing as expected. |
| Date: 23 May 2011 |
|
|
| No. 233 - Orbital Correction Manoeuvres |
Report for the period 27 March to 23 April 2011 (week 13 - week 16)
The reporting period, covering four weeks of Venus Express mission operations, was devoted to routine science activities. |
| Date: 12 May 2011 |
|
|
| No. 155 - Downlinking of images and abbreviated solar array test |
Report for the period 24 March to 17 April 2011 This report covers 25 days of Rosetta mission operations. The main activities were the downlinking of images acquired by OSIRIS and the navigation cameras during the previous reporting period and an abbreviated test of the solar arrays. |
| Date: 05 May 2011 |
|
|