| No. 79 - Entry into Quadrature |
Report for period 13 May to 19 May 2007 The Entry in the Quadrature phase with fake ephemeris has been successful. The temperatures of all subsystems are also within limits. In order to perform science during this phase, a 17 hour cooling is required before any S/C communication. This has forced the missing of some of the passes at Cebreros. Not having sufficient passes to uplink all the commands, Venus Express is using, for the first time, the option of "delayed TC files" to store and call the commands on-board at a specific time. |
| Date: 20 May 2007 |
|
|
| No. 78 - Start of Quadrature Phase |
| Report for Period 6 May to 12 May 2007
With the installation of AOCMS_SW patch 14 and the update of the on-board ephemeris, Venus Express was configured for the quadrature phase. This phase is defined as the period during which the Sun-Spacecraft-Earth angle is between 75° and 95°. |
| Date: 16 May 2007 |
|
|
| No. 77 - Mission Update |
| Report for Period 29 April to 5 May 2007
During the reporting period the mission operations have been conducted according to the plan.
Science operations have been nominal. |
| Date: 14 May 2007 |
|
|
| No. 76 - Mission Operations Report |
| Report for Period 22 April to 28 April 2007
During the reporting period the mission operations have been conducted according to the plan and science operations have been nominal. |
| Date: 07 May 2007 |
|
|
| No. 75 - Mission Update |
| Report for Period 15 April to 21 April 2007
During the reporting period the mission operations have been conducted according to the plan. Science operations have been nominal. |
| Date: 27 Apr 2007 |
|
|
| No. 74 - VIRTIS Movie Passes |
| Report for Period 8 April to 14 April 2007
During the reporting period the VIRTIS movie observations have taken place. The resulting science data have been received on ground in its entirety via DSN station DSS-63 (Madrid, 70m diameter), with Cebreros serving as backup in shadow-track. No data loss has been reported. |
| Date: 25 Apr 2007 |
|
|
| No. 73 - Mission Operations Report |
| Report for Period 1 April to 7 April 2007 During the reporting period the mission operations have been conducted according to the plan. Science operations have been nominal. |
| Date: 25 Apr 2007 |
|
|
| No. 72 - Mission Latest |
Report for Period 25 March to 31 March 2007
During the reporting period the mission operations have been conducted according to the plan. Science operations have been nominal.
|
| Date: 02 Apr 2007 |
|
|
| No. 71 - Venus Express Status |
Report for Period 17 March to 24 March 2007
During the reporting period the mission operations have been conducted according to the plan. Science operations have been nominal. |
| Date: 26 Mar 2007 |
|
|
| No. 70 - Mission Update |
| Report for Period 11 March to 17 March 2007 During the reporting period the mission operations have been conducted according to the plan. Science operations have been nominal. |
| Date: 18 Mar 2007 |
|
|
| No. 69 - Mission Operations Report |
Report for Period 04 March to 10 March 2007 During the reporting period the mission operations have been conducted according to the plan. Science operations have been nominal. |
| Date: 11 Mar 2007 |
|
|
| No. 68 - Mission Latest |
Report for Period 25 February to 03 March 2007 During the reporting period the mission operations have been conducted according to the plan. Science operations have been nominal. Radio science activities with the New Norcia ground station have been conducted as planned. |
| Date: 05 Mar 2007 |
|
|
| No. 67 - Mission Update |
Report for Period 18 February to 24 February 2007 During the reporting period the mission operations have been conducted according to the plan. Science operations have been nominal. Radio science activities with the New Norcia ground station have been conducted as planned. |
| Date: 25 Feb 2007 |
|
|
| No. 66 - Mission Update |
Report for Period 11 February to 18 February 2007
During the reporting period the mission operations have been conducted according to the plan. Science operations have been nominal. Radio science activities with the New Norcia ground station have been conducted as planned. |
| Date: 19 Feb 2007 |
|
|
| No. 64 - Earth Occultation Observations |
| Report for Period 28 January to 3 February 2007 During the reporting period the mission operations have been conducted according to the plan. Science operations have been nominal. Radio science activities with the New Norcia ground station have been conducted as planned. |
| Date: 07 Feb 2007 |
|
|
| No. 63 - Earth Occultation Observations |
| Report for Period 21 January to 27 January 2007 During the reporting period the mission operations have been conducted according to the plan. Science operations have been nominal. Radio science activities with the New Norcia ground station have been conducted as planned. |
| Date: 31 Jan 2007 |
|
|
| No. 62 - Earth Occultation Observations |
| Report for Period 14 January to 20 January 2007 During the reporting period the mission operations have been conducted according to the plan. Science operations have been nominal. Radio science activities with the New Norcia ground station have been conducted as planned. |
| Date: 25 Jan 2007 |
|
|
| No. 61 - Routine Mission Operations |
| Report for Period 7 January to 13 January 2007
During the reporting period the mission operations have been conducted according to the plan. Science operations have been nominal and not affected by some problems observed with the Cebreros ground station. Radio science activities with the New Norcia ground station have been conducted as planned. |
| Date: 16 Jan 2007 |
|
|
| No. 60 - Mission Update |
| Report for the period 31 December 2006 - 6 January 2007 During the reporting period the mission operations have been conducted according to the plan.
Science operations have been nominal and not affected by some problems observed with the
Cebreros ground station. Radio science activities with the New Norcia ground station have been
conducted as planned. |
| Date: 08 Jan 2007 |
|
|
| No. 59 - Routine Science Operations |
| Report for Period 17 December to 30 December 2006
During the reporting period the mission operations have been conducted according to the plan.
|
| Date: 03 Jan 2007 |
|
|