• → European Space Agency

    • About Science & Technology

    • For Public

    • For Educators

    • ESA

    • Science & Technology

    • Venus Express

    • Missions
    • Show All Missions
    • Mission Home
    • Summary
    • Fact Sheet
    • Objectives
    • Mission Team
    • Orbit View
    • Background Science
    • Venus vs Earth
    • Venus Transits
    • Spacecraft
    • 3D Model
    • Instruments
    • Engineering
    • Mission Operations…

      • Launch Vehicle
      • Launch Campaign
      • Launch Phase
      • Cruise Phase
      • Orbit Insertion
      • Operational Orbit
      • ESOC info
      • Status Reports
    • Science Operations
    • Venus Express Science Operations
    • Data Archive
    • Resources
    • News Archive
    • Multimedia Gallery
    • Publication Archive
    • Status Report Archive
    • Calendar of Events
    • Services
    • Contact Us
    • Subscribe
    • Terms and Conditions
    • Bookmark and Share

    Status Report archive

    Search Results:

    ‹   | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | ›   » [Refine Search]
    260 items found  page 8 of 13
    No. 118 - Routine Operations
    Report for Period 10 February to 16 February 2008

    Routine activities were carried out during the reporting period apart from a brief entry into safe mode.

    Date: 19 Feb 2008
    No. 117 - Routine Operations
    Report for Period 03 February to 09 February 2008

    Routine activities were carried out during the reporting period apart from a brief entry into safe mode.

    Date: 12 Feb 2008
    No. 116 - Routine Operations
    Report for Period 27 January to 02 February 2008

    Routine activities were carried out during the reporting period apart from a brief entry into safe mode.

    Date: 05 Feb 2008
    No. 115 - Routine Operations
    Report for Period 20 January to 26 January 2008

    Routine activities were carried out during the reporting period.

    Date: 29 Jan 2008
    No. 114 - Routine Operations
    Report for Period 13 January to 19 January 2008

    Routine activities were carried out during the reporting period.

    Date: 22 Jan 2008
    No. 113 - Routine Operations
    Report for Period 06 January to 12 January 2008

    Routine activities were carried out during the reporting period.

    Date: 15 Jan 2008
    No. 112 - Routine Operations
    Report for Period 30 December 2007 to 05 January 2008

    Routine activities were carried out during the reporting period.

    Date: 08 Jan 2008
    No. 111 - Routine Operations
    Report for Period 23 December to 29 December 2007

    It took several days to download the VIRTIS data stored onboard the spacecraft after the problems at Cebreros reported in the previous week.

    Date: 02 Jan 2008
    No. 110 - Routine Operations
    Report for Period 16 December to 22 December 2007

    The activities during this week cover routine operations. In addition, heavy snow fall in Cebreros caused some problems with data download. The data was eventually downloaded in the subsequent days.

    Date: 27 Dec 2007
    No. 109 - Routine Operations
    Report for Period 09 December to 15 December 2007

    The activities during this week cover routine operations

    Date: 18 Dec 2007
    No. 106 - End of Quadrature Operations
    Report for Period 18 November to 24 November 2007

    The activities during this week cover routine operations, skipping passes for cooling purposes and the end of the Quadrature Phase on 23 November. VIRTIS operations have continued during the period.

    Date: 12 Dec 2007
    No. 108 - Routine Operations
    Report for Period 02 December to 08 December 2007

    The activities during this week cover routine operations

    Date: 11 Dec 2007
    No. 107 - Routine Operations
    Report for Period 25 November to 01 December 2007

    Routine mission operations were carried out during the reporting period.

    Date: 04 Dec 2007
    No. 105 - Quadrature Operations
    Report for Period 11 November to 17 November 2007

    The activities during this week cover routine operations in Quadrature. These operations are severely constrained due to the special thermal restrictions that apply during Quadrature phase. VIRTIS operations were resumed in this period.

    Date: 28 Nov 2007
    Venus Express Status Report - November 2007
    An anomaly in the solar array drive circuitry, already known on Mars Express, was detected on Venus Express for the first time on 23 August 2007. Within 24 hours the error happened twice. This resulted in a three day stop of all science operations. It was decided to implement the Mars Express patch to solve the problem. Following the trigger of the same event for the -Y wing on 18 September, the patch was also enabled for that wing. Since then S/C operations have been performed nominally.
    Date: 19 Nov 2007
    No. 104 - Quadrature Operations

    Report for the Period 4 November to 10 November 2007

    The activities during this week cover routine operations in Quadrature. These operations are severely constrained due to the special thermal restrictions that apply during Quadrature phase. VIRTIS operations were resumed in this period.

    Date: 13 Nov 2007
    No. 103 - Ongoing Quadature Operations

    Report for the Period 28 October to 3 November 2007

    The activities during this week cover routine operations in Quadrature. These operations are severely constrained due to the special thermal restrictions that apply during Quadrature phase. The swap from HGA2 to HGA1 was also carried out this week.

    Date: 07 Nov 2007
    No. 102 - Quadrature Operations

    Report for the Period 21 October to 27 October 2007

    Following last week's entry in Quadrature phase, the activities during this week cover routine operations in Quadrature. These operations are severely constrained due to the special thermal restrictions that apply during Quadrature phase.

    Date: 29 Oct 2007
    No. 101 - Mission Progress
    Report for Period 14 October to 20 October 2007

    The Main activity during this week has been the entrance in Quadrature on the 19 October 2007. The procedure was fully automated as part of the routine plan following the experience of the previous quadrature. The fake ephemeris was again applied in GSP before the AOS in Cebreros.

    Date: 24 Oct 2007
    No. 100 - Mission Latest
    Report for Period 7 October to 13 October 2007

    Routine observations took place during this reporting period.

    Date: 18 Oct 2007
     
    ‹   | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | ›   » [Refine Search]
    260 items found  page 8 of 13
     


    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • Google Buzz
    • Livestream
    • Subscribe
    • App Store
    • ESA Science Twitter

    Follow ESA science

    • Copyright 2000 - 2013 © European Space Agency. All rights reserved.

    • Terms and Conditions