• → European Space Agency

    • About Science & Technology

    • For Public

    • For Educators

    • ESA

    • Science & Technology

    • Cassini-Huygens

    • Missions
    • Show All Missions
    • Mission Home
    • Summary
    • Fact Sheet
    • Objectives
    • Mission Team
    • Orbit View
    • Science…

      • Saturn
      • Rings
      • Titan
      • Moons
      • Magnetosphere
    • Huygens Probe
    • Huygens
    • Instruments
    • Engineering
    • Cassini Orbiter
    • 3D Model
    • Instruments
    • Engineering
    • Mission Operations
    • Launch Vehicle
    • Launch Information
    • Approach and Arrival
    • Getting to Saturn
    • Huygens Probe Separation
    • Titan Surface Landing
    • Flybys
    • Science Operations
    • Data Archive
    • Resources
    • News Archive
    • Multimedia Gallery
    • Publication Archive
    • Calendar of Events
    • Services
    • Contact Us
    • Subscribe
    • Terms and Conditions
    • Bookmark and Share

    No. 15 - Second Battery Depassivation

    07 Dec 2004 09:08

    The second run of the Huygens Battery Depassivation sequence was successfully executed on 5 December.

    Initial indications are that the data looks exactly the same as the first depassivation from 19 September, with all Probe systems exhibiting nominal behaviour.

    The depassivation sequence, which was run in "Flight Checkout Suspend" mode and Pre-T0, started at 06:00:00 (SCET/UTC) and lasted for 35 minutes, after which there was a 5 minute pause before the Probe Saving sequence started. This lasted for 8 minutes and was run to ensure that no battery remained connected to the Probe power bus.

    Each battery exhibited essentially the same behaviour during each of the 5 minute depassivation periods, with voltages starting at ~65V and slowly increasing to ~70V. Measurements on the bus side showed battery currents of ~1.9A with a similar value being measured from the Cassini line, which indicated an equal sharing of the bus load between battery and Cassini. Bus voltage was steady at 28V.


    Last Update: 15 Dec 2004

    • Shortcut URL
    • http://sci.esa.int/jump.cfm?oid=36188
    • Status Reports
    • Archives

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • Google Buzz
    • Livestream
    • Subscribe
    • App Store
    • ESA Science Twitter

    Follow ESA science

    • Copyright 2000 - 2013 © European Space Agency. All rights reserved.

    • Terms and Conditions