• → European Space Agency

    • About Science & Technology

    • For Public

    • For Educators

    • ESA

    • Science & Technology

    • Rosetta

    • Missions
    • Show All Missions
    • Mission Home
    • Summary
    • Fact Sheet
    • Mission Team
    • Orbit View
    • Background Science
    • 67P/C-G
    • (2867) Steins
    • (21) Lutetia
    • Asteroids
    • Map of Lutetia
    • Orbiter
    • 3D Model
    • Instruments
    • Engineering
    • Lander
    • Instruments
    • Mission Operations
    • Mission Operations
    • Launch Vehicle
    • 2nd Rosetta Launch Campaign
    • Launch Information
    • ESOC Info
    • Science Operations
    • RSOC
    • Data Archive
    • Resources
    • News Archive
    • Multimedia Gallery
    • Publication Archive
    • Calendar of Events
    • Status Report Archive
    • Services
    • Contact Us
    • Subscribe
    • Terms and Conditions
    • Bookmark and Share

    No. 35 - Rosetta

    31 Jan 2005 10:33

    Report for the period 17 to 27 January 2005

    The spacecraft is in cruise mode. In the reporting period a number of outstanding troubleshooting activities were carried out, in addition to the routine flight operations and monitoring tasks.

    On 17 January a CCD health check on Star Tracker B was carried out, to confirm the existence of a hot pixel detected in December by the on-board software. This activity triggered other investigations on both Star Trackers, as on the same day Star Tracker A also detected a hot pixel. After power cycling both Star Trackers did not report any hot pixel anymore. A final CCD Health check was executed on 27 January and data are still being analysed.

    On 20 January the OSIRIS instrument was activated and a software upload was successfully carried out to solve a problem on the door mechanism detected in the commissioning phase. Unfortunately the tests following the software update concluded that the new software did not solve the problem. Investigations by the instrument team will continue. In this occasion the instrument took pictures of comet Macholtz, as part of the verification of the instrument operations. OSIRIS was deactivated at the end of the New Norcia pass.

    SREM is kept active for background monitoring operations. All other instruments are inactive.

    Four passes were taken in the reporting period over New Norcia. In addition, on DSN request, a pass over DSS-24 was taken to support a test of the new ground equipment NSP 5.5.1. This test however was not successful due to an unexpected configuration on DSN side, which prevented a connection from ESOC. A slot for test repetition will be agreed in the near future, either with Rosetta or Mars Express.

    The table below shows a chronology of the main activities in the reporting period (only active passes shown):

    Mission Day

    Date

    DOY

    Main Activity

    322

    17.01.05

    017 Star Tracker B Health Check

    325

    20.01.05

    020 OSIRIS SW Upload and verification

    329

    24.01.05

    024 Tracking pass

    331

    26.01.05

    026 DSN pass: Test DSN NSP 5.5.1

    332

    27.01.05

    027 Monitoring pass, STRs hot pixels investigation

    At the end of the last New Norcia pass in the reporting period (DOY 027) Rosetta was at 13.4 million km from the Earth. The one-way signal travel time was 44 seconds.


    Last Update: 06 Nov 2006

    • Shortcut URL
    • http://sci.esa.int/jump.cfm?oid=36433
    • Status Reports
    • Archives

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • Google Buzz
    • Livestream
    • Subscribe
    • App Store
    • ESA Science Twitter

    Follow ESA science

    • Copyright 2000 - 2013 © European Space Agency. All rights reserved.

    • Terms and Conditions