• → European Space Agency

    • About Science & Technology

    • For Public

    • For Educators

    • ESA

    • Science & Technology

    • Venus Express

    • Missions
    • Show All Missions
    • Mission Home
    • Summary
    • Fact Sheet
    • Objectives
    • Mission Team
    • Orbit View
    • Background Science
    • Venus vs Earth
    • Venus Transits
    • Spacecraft
    • 3D Model
    • Instruments
    • Engineering
    • Mission Operations…

      • Launch Vehicle
      • Launch Campaign
      • Launch Phase
      • Cruise Phase
      • Orbit Insertion
      • Operational Orbit
      • ESOC info
      • Status Reports
    • Science Operations
    • Venus Express Science Operations
    • Data Archive
    • Resources
    • News Archive
    • Multimedia Gallery
    • Publication Archive
    • Status Report Archive
    • Calendar of Events
    • Services
    • Contact Us
    • Subscribe
    • Terms and Conditions
    • Bookmark and Share

    Venus Express Umbilical Connections Tests

    13 Oct 2005 13:38

    Today, 13 October, saw the first switch-on of the Venus Express spacecraft after its mating with the Fregat Upper Stage.

    Prior to this, the umbilical connectors between Fregat, through which the spacecraft is powered and commanded while still on the ground, had been mated: the only electrical connection to the spacecraft is now through the launch vehicle's umbilical ground connector located on the skin of the interstage section of the Fregat Upper Stage.

    Venus Express and Launch Vehicle Adapter mated with the Fregat upper stage, yesterday, 12 October 2005.

    After switch-on a set of basic electrical tests was carried out to verify integrity of all umbilical connections from the Electrical Ground Support Equipment (EGSE) through Fregat and Launch Vehicle Adaptor up to the spacecraft. After completion of the tests the spacecraft was switched off, with the next switch-on planned only for the final arming of the spacecraft's flight batteries on the night before the rollout to the launch pad.

    The last activity of the day was the connection of the pyrotechnic lines between Launch Vehicle Adaptor and Fregat, through which the Fregat will initiate the separation of the spacecraft from the launch vehicle, by firing the pyrotechnic boltcutters of the clampband.


    Last Update: 08 Nov 2005

    • Shortcut URL
    • http://sci.esa.int/jump.cfm?oid=38133
    • Images and Videos
    • Venus Express Mating with Fregat
    • Journal
    • Archives
    • See also
    • 8/9 November - Launch
    • 7 November
    • 6 November
    • 5 November - Part II
    • 5 November - Part I
    • 3 November
    • 20 October
    • 19 October
    • 18 October
    • 17 October
    • 14 October
    • 13 October
    • 12 October
    • 19 September
    • 5 September
    • 30 August
    • 22 August
    • 16 August
    • 10 August
    • Launch Campaign

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • Google Buzz
    • Livestream
    • Subscribe
    • App Store
    • ESA Science Twitter

    Follow ESA science

    • Copyright 2000 - 2013 © European Space Agency. All rights reserved.

    • Terms and Conditions