No. 52 - Spacecraft Monitoring and Maintenance

12 Dec 2005 13:00

Report for Period 18 November to 9 December 2005

The reporting period covers three weeks of passive cruise, with monitoring and minor maintenance activities.

On the spacecraft subsystems side, minor maintenance activities were executed, i.e. gyro drift compensation for IMP B, the first periodic dump of avionics standard parameters. Reaction wheel offloading is now executed once every two weeks.

On the spacecraft subsystems side, minor maintenance activities were executed, i.e. gyro drift compensation for IMP B, the first periodic dump of avionics standard parameters. Reaction wheel offloading is now executed once every two weeks.

A total of 3 New Norcia passes were taken over the reporting period.

NNO Pass Date DOY Main Activity
634 24.11.05

328

Monitor pass
642 02.12.05

336

Monitor pass
648 08.12.05

342

RPC IES test, Avionics Dumps, Gyro drift comp

At the end of the reporting period (DOY 343) Rosetta was at 327 million km from the Earth (2.19 AU; one-way signal travel time was 18 minutes 11 seconds). The distance to Sun was 262 million km (1.75 AU).

Future Milestones

Preparation for the first Solar Conjunction continues. The spacecraft will be at an angular distance from the Sun below 5 degrees between mid March and mid May 2006, with a minimum separation angle of about 0.3 degrees on the 13th.

Just before the start of the Solar Conjunction the third Payload Passive Checkout (PC2) will take place in March 2006.


____________________________________
Last Update: 06 Nov 2006
Print this   Email this
STATUS REPORTS ARCHIVE
 
 LEGAL DISCLAIMER   SITEMAP  GLOSSARY  SUBSCRIBE   CONTACT FAQ 
  Copyright 2000 - 2010 © European Space Agency. All rights reserved.