• → European Space Agency

    • About Science & Technology

    • For Public

    • For Educators

    • ESA

    • Science & Technology

    • XMM-Newton

    • Missions
    • Show All Missions
    • Mission Home
    • Summary
    • Fact Sheet
    • Objectives
    • Orbit View
    • Spacecraft
    • Spacecraft
    • 3D Model
    • Instruments
    • X-ray Mirrors
    • Engineering
    • Mission Operations
    • Launch Vehicle
    • Launch Campaign
    • Orbit/Navigation
    • Science Operations
    • Slew Survey and Catalogue
    • SOC
    • Data Archive
    • Resources
    • News Archive
    • Multimedia Gallery
    • Publication Archive
    • Calendar of Events
    • Services
    • Contact Us
    • Subscribe
    • Terms and Conditions
    • Bookmark and Share

    Spacecraft on Adapter

    24 Nov 1999 11:50

    Only two weeks away from the final count and the XMM satellite campaign in Kourou remains on track for the launch on 10 December.

    Positioning XMM over the launch adapter

    Cleaning XMM interface before fastening

    Bringing XMM onto ACU, just visible are the ends of the closed XMM Mirror Modules

    Fastening the clampband

    Top view of XMM from one of the upper levels

    The spacecraft has now been mounted on its launch adapter (ACU - Adaptateur Charge Utile). This cylindrical structure interfaces with the launcher and will ensure the release of the spacecraft.

    The ACU mounting took place on 23 November. It entailed hoisting XMM, verifying its interface, lowering the spacecraft onto the ACU, having once again verified and cleaned all the mechanical interfaces.

    Then the clamp band was installed, rather like a belt, fastening the spacecraft to the ACU. (At the end of the Ariane 5 flight, the satellite will be released when the clamp band is severed pyrotechnically). The clamp band was centred very precisely and tightened in several steps (to a value of 45kN) under the constant supervision of XMM quality assurance staff.

    After the spacecraft had been mounted on the ACU, XMM was electrically reconnected via its umbilical cables.

    A504 fairing

    The A504 launcher campaign is progressing normally in the BAF, including preparations for the combined launcher and spacecraft operations (POC). This has involved connections, cleaning, line checks and ground systems. Combined Operations will begin with the mating of the spacecraft ACU to the launcher.

    The launch vehicles fairing has also arrived in the Final Assembly Building.

    Diagram of XMM on Ariane 5

    Two halves of the A504 fairing arriving at the Kourou spaceport

     


    Last Update: 11 Jan 2006

    • Shortcut URL
    • http://sci.esa.int/jump.cfm?oid=38461
    • Journal
    • Archives
    • See also
    • 10 December - Launch
    • Launch Campaign Summary
    • 9 December
    • 8 December
    • 7 December
    • 6 December
    • 4 December
    • 2 December
    • 1 December
    • 29 November
    • 28 November
    • 26 November
    • 25 November
    • 24 November
    • 22 November
    • 19 November
    • 18 November
    • 17 November
    • 15 November
    • Launch Campaign

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • Google Buzz
    • Livestream
    • Subscribe
    • App Store
    • ESA Science Twitter

    Follow ESA science

    • Copyright 2000 - 2013 © European Space Agency. All rights reserved.

    • Terms and Conditions