No. 48 - Latest Operational Update28 Feb 2006 16:47 Report for period 16 January to 19 February 2006
Smart-1 suffered another Double EDAC error on 19 of January. SSC requested ESOC to compile all addresses that have been subject of double EDAC errors and sent them to SSC to check for a possible correlation with a specific chip malfunction. This time ESOC tried a new procedure that prevents loosing any data, this was done on 20 January and proved to be successful.
For the rest, Smart-1 operation has been nominal during the reporting period. The RF compatibility tests for the ranging tone tests with the Chinese CLTC and India ISRO have been completed. The tests were complemented with two specific tests using ESA ground stations: Maspalomas with Cortex and Redu with Enertec. Both stations provided and excellent support although only the Cortex tests were successful. In addition an image of Crater Billy was released during this period and additional images are anticipated during the next reporting period. Future ActivitiesFuture activities are focused on the following:
Spacecraft StatusSummary AOCS TT&C EP, Power and Thermal Orbital Information
The changes since apolune 1925 are as follows:
Last Update: 19 Apr 2006
|
||||||||||||||||||||
Crater Billy