• → European Space Agency

    • About Science & Technology

    • For Public

    • For Educators

    • ESA

    • Science & Technology

    • Venus Express

    • Missions
    • Show All Missions
    • Mission Home
    • Summary
    • Fact Sheet
    • Objectives
    • Mission Team
    • Orbit View
    • Background Science
    • Venus vs Earth
    • Venus Transits
    • Spacecraft
    • 3D Model
    • Instruments
    • Engineering
    • Mission Operations…

      • Launch Vehicle
      • Launch Campaign
      • Launch Phase
      • Cruise Phase
      • Orbit Insertion
      • Operational Orbit
      • ESOC info
      • Status Reports
    • Science Operations
    • Venus Express Science Operations
    • Data Archive
    • Resources
    • News Archive
    • Multimedia Gallery
    • Publication Archive
    • Status Report Archive
    • Calendar of Events
    • Services
    • Contact Us
    • Subscribe
    • Terms and Conditions
    • Bookmark and Share

    Venus Orbit Insertion

    The Venus Express Orbit Insertion (VOI) manoeuvre took place on 11 April 2006. To enable capture of the spacecraft, it was first slewed such that the main engine was aligned to the direction of travel.

    The table below shows the timetable of events throughout the capture burn.

    Event Spacecraft Time
    (UTC)
    Ground Receive
    Time (UTC)
    VOI LSP start 07:07:59 07:14:44
    VOI main engine start 07:10:29 07:17:14
    Pericentre passage 07:36:37
    Eclipse start 07:37:45
    Occultation start 07:38:27 07:45:12
    Occultation end 07:48:33 07:55:18
    Eclipse end 07:55:13
    VOI burn end 08:00:42 08:07:28

    The main engine burn lasted around 50 minutes and decelerated the spacecraft by approximately 1251 ms-1 (~ 4500 kmh-1).

    The spacecraft intially entered a highly elliptical polar orbit with a pericentre of 400 km, an apocentre of 350 000 km and a period of 9 days.

    To achieve the final operational orbit a series of necessary correction manoeuvres was performed:

    Date Activity Velocity
    Change (m/s)
    15 April 2006 Pericentre Control Manoeuvre #1 5.8
    20 April 2006 Apocentre Lowering Manoeuvre #1 199.9
    23 April 2006 Apocentre Lowering Manoeuvre #2 105.3
    26 April 2006 Apocentre Lowering Manoeuvre #3 9.2
    29 April 2006 Apocentre Lowering Manoeuvre #4 8.0
    2 May 2006 Apocentre Trim 2.0
    6 May 2006 Pericentre Control Manoeuvre #2 3.1


    Last Update: 24 May 2007

    • Shortcut URL
    • http://sci.esa.int/jump.cfm?oid=38947
    • Images and Videos
    • Venus Express Orbit Insertion
    • See also
    • Venus Express Enters Orbit

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • Google Buzz
    • Livestream
    • Subscribe
    • App Store
    • ESA Science Twitter

    Follow ESA science

    • Copyright 2000 - 2013 © European Space Agency. All rights reserved.

    • Terms and Conditions