• → European Space Agency

    • About Science & Technology

    • For Public

    • For Educators

    • ESA

    • Science & Technology

    • SMART-1 Lunar Impact

    • Missions
    • Show All Missions
    • Lunar Impact
    • Impact Schedule - 01 September
    • Impact Science
    • Observing the Moon around Impact
    • SMART-1 Impact Site Visibility from Earth
    • Participating Observatories
    • News
    • Results from Observations
    • SMART-1 Mission
    • Pre-Launch
    • Launch
    • Earth Bound
    • Moon Bound
    • Status Reports
    • SMART-1 Links
    • ESA Portal
    • SciTech
    • AMIE Camera
    • SPEDE
    • D-CIXS
    • Swedish Space Corporation
    • Bookmark and Share

    SMART-1 Launch Phase

    On 15 July 2003, the cargo plane carrying SMART-1 with its flight container arrived at the Cayenne airport in French Guyana. This marked the start of the SMART-1 launch campaign. The below overview lists key events of the mission during the last months up to launch.

    15 July 2003 - Start of Launch Campaign in Kourou

    After its arrival at Cayenne airport, SMART-1 was transferred by truck to Kourou, where the spacecraft was removed from its transport container. An initial inspection was carried out to verify SMART-1's condition after transport.

    Journal: Launch Campaign Gets Underway

    Arrival at Cayenne

    Unloading SMART-1

    Spacecraft checks

    August 2003 - Simulation Runs of Flight Operations

    Journal: Simulation runs at Flight Operations Centre, ESOC Darmstadt

    13 August 2003 - Launch on Hold 

    The initial launch date of 28 August 2003, 23:04 UT, was pushed back to allow necessary verification checks on one of the two commercial satellites that were also scheduled to be launched on the same flight as SMART-1.

    News: SMART-1 Launch Delayed

    19 August 2003 - Second Launch Delay

    News: SMART-1 Launch Put Back

    17 September 2003 - SMART-1 Mated with Launcher

    Journal: SMART-1 mated with launcher

    SMART-1 hoisted up

    Fixing to Launcher

    On top of Launcher

    19 September 2003 - New Launch Date Confirmed

    News: SMART-1 Launch Date set for 27 September

    26 September 2003 - SMART-1 Ready for Launch

    Journal: Launch Readiness Review completed
    Journal: Roll-out to Launch Pad

    27 September 2003 - Launch of SMART-1

    SMART-1 Launch

    On 27 September, at 23:14 UT, Flight 162 successfully cleared the launch pad and SMART-1 was placed into its initial geostationary transfer orbit.

    News: Successful launch of Ariane Flight 162

     


    Last Update: 23 Aug 2006

    • Shortcut URL
    • http://sci.esa.int/jump.cfm?oid=39838

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • Google Buzz
    • Livestream
    • Subscribe
    • App Store
    • ESA Science Twitter

    Follow ESA science

    • Copyright 2000 - 2013 © European Space Agency. All rights reserved.

    • Terms and Conditions