• → European Space Agency

    • About Science & Technology

    • For Public

    • For Educators

    • ESA

    • Science & Technology

    • Venus Express

    • Missions
    • Show All Missions
    • Mission Home
    • Summary
    • Fact Sheet
    • Objectives
    • Mission Team
    • Orbit View
    • Background Science
    • Venus vs Earth
    • Venus Transits
    • Spacecraft
    • 3D Model
    • Instruments
    • Engineering
    • Mission Operations…

      • Launch Vehicle
      • Launch Campaign
      • Launch Phase
      • Cruise Phase
      • Orbit Insertion
      • Operational Orbit
      • ESOC info
      • Status Reports
    • Science Operations
    • Venus Express Science Operations
    • Data Archive
    • Resources
    • News Archive
    • Multimedia Gallery
    • Publication Archive
    • Status Report Archive
    • Calendar of Events
    • Services
    • Contact Us
    • Subscribe
    • Terms and Conditions
    • Bookmark and Share

    No. 97 - Mission News

    25 Sep 2007 09:58

    Report for Period 16 September to 22 September 2007

    Routine observations took place during this reporting period.

    The table below shows a chronology of the main activities in the reporting period:

    MET (Day) Date DOY Main Activity
    677 16/09/07 259 Routine operations
    678 17/09/07 260 Routine operations
    679 18/09/07 261 Routine Operations. TM bitrate decreased to 91 kps after pass.
    680 19/09/07 262 Routine Operations
    681 20/09/07 263 Routine Operations. Pass shortened because of CEB maintenance.
    682 21/09/07 264 Routine Operations
    683 22/09/07 265 Routine Operations

    At the end of the last Cebreros pass in the reporting period (DOY 265, 18:00z) Venus Express was orbiting Venus at 64.2 million km from the Earth. The one-way signal travel time was 214 seconds.

    Payload Activities

    ASPERA
    The instrument was operated as part of the routine plan.

    MAG
    The instrument was operated as part of the routine plan.

    PFS
    The instrument was not operated during the reporting period.

    SPICAV
    The instrument was operated as part of the routine plan.

    VeRA
    No RSI activities took place this week

    VIRTIS
    Only Virtis M part has been operated during this period as the failure of H cooler is still under investigation.

    VMC
    The instrument was operated as part of the routine plan.

    Future Milestones

    • Test DDOR with DSN and ESA stations in coming week
    • Quadrature start 19 October


    Last Update: 28 Sep 2007

    • Shortcut URL
    • http://sci.esa.int/jump.cfm?oid=41379
    • Status Reports
    • Archives

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • Google Buzz
    • Livestream
    • Subscribe
    • App Store
    • ESA Science Twitter

    Follow ESA science

    • Copyright 2000 - 2013 © European Space Agency. All rights reserved.

    • Terms and Conditions