No. 109 - Routine Operations

No. 109 - Routine Operations

Report for Period 09 December to 15 December 2007The activities during this week cover routine operations

The table below shows a chronology of the main activities in the reporting period:

MET (Day) Date DOY Main Activity
761 09/12/07 343 Routine Operations
762 10/12/07 344 Routine Operations
763 11/12/07 345 Routine Operations
764 12/12/07 346 Routine Operations
765 13/12/07 347 Routine Operations
766 14/12/07 348 Routine Operations
767 15/12/07 349 Routine operations

At the end of the last Cebreros pass in the reporting period (DOY 349, 12:00z) Venus Express was orbiting Venus at 155.8 million km from the Earth. The one-way signal travel time was 519 seconds.

Payload Activities

ASPERA
The instrument was regularly operated as part of the routine plan.

MAG
The instrument was regularly operated as part of the routine plan.

PFS
The instrument was not operated during the reporting period.

SPICAV
The instrument was regularly operated as part of the routine plan.

VeRA
No RSI activities took place this week.

VIRTIS
The instrument was regularly operated as part of the routine plan.

VMC
The instrument was regularly operated as part of the routine plan.

Future Milestones

  • Christmas period planning
  • New Norcia and Cebreros scheduling for 2008

Last Update: 1 September 2019
25-Apr-2024 00:05 UT

ShortUrl Portlet

Shortcut URL

https://sci.esa.int/s/8aNnKJA

Images And Videos

Related Publications

Related Links

See Also

Documentation