No. 115 - Routine Operations

No. 115 - Routine Operations

Report for Period 20 January to 26 January 2008Routine activities were carried out during the reporting period.

The table below shows a chronology of the main activities in the reporting period:

MET (Day) Date DOY Main Activity
803 20/01/08 020 Routine Operations
804 21/01/08 021 Routine Operations
805 22/01/08 022 Routine Operations
806 23/01/08 023 Routine Operations
807 24/01/08 024 Routine Operations
808 25/01/08 025 Routine Operations
802 26/01/08 019 Routine operations

At the end of the last Cebreros pass in the reporting period (DOY 026, 12:00z) Venus Express was orbiting Venus at 195.3 million km from the Earth. The one-way signal travel time was 651 seconds.

Payload Activities

ASPERA
The instrument was regularly operated as part of the routine plan.

MAG
The instrument was regularly operated as part of the routine plan.

PFS
The instrument was not operated during the reporting period.

SPICAV
The instrument was regularly operated as part of the routine plan.

VeRA
Occultation passes with NNO continue to take place as planned. In this reporting period there were passes on DOY 021, 22, 23, 24 and 25. All were nominally completed.

VIRTIS
The instrument was regularly operated as part of the routine plan.

VMC
The instrument was regularly operated as part of the routine plan.

Future Milestones

  • Routine mission planning
Last Update: 1 September 2019
23-Apr-2024 13:23 UT

ShortUrl Portlet

Shortcut URL

https://sci.esa.int/s/8gNzJGW

Images And Videos

Related Publications

Related Links

See Also

Documentation