No. 121 - Routine Operations

No. 121 - Routine Operations

Report for Period 2 March to 8 March 2008Routine operations continued nominally as planned.

The team's work was focused on completing the reports for the Mars Express/Venus Express Mission Extension Operations Review planned for 11 March.

The technical details for the battery deep discharge testing are being worked on as well. The target is to perform the test in April.

The table below shows a chronology of the main activities in the reporting period:

MET (Day) Date DOY Main Activity
845 02/03/08 062 Routine Operations
846 03/03/08 063 Routine Operations
847 04/03/08 064 Routine Operations
848 05/03/08 065 Routine Operations
849 06/03/08 066 Routine Operations
850 07/03/08 067 Routine Operations
851 08/03/08 068 Routine Operations

At the end of the last Cebreros pass in the reporting period (DOY 068) Venus Express was orbiting Venus at 226.7 million km from the Earth. The one-way signal travel time was 760 seconds.

Payload Activities

ASPERA
The instrument was regularly operated as part of the routine plan.

MAG
The instrument was regularly operated as part of the routine plan.

PFS
The instrument was not operated during the reporting period.

SPICAV
The instrument was regularly operated as part of the routine plan.

VeRA
Two occultation passes took place with New Norcia (DOY 063 and 064) and were nominally completed.

VIRTIS
The instrument was regularly operated as part of the routine plan.

VMC
The instrument was regularly operated as part of the routine plan.

Future Milestones

  • Battery deep discharge test planned on 22 April
  • Technical note about pericentre reduction operations released
  • New on-board control procedure for the disabling of virtual channel zero (VC0) routing outside visibility. VC0 is used for spacecraft housekeeping telemetry
  • Release of the HGA-1 S-band anomaly report
  • Technical note about operations planning for solar conjunction released
  • Mission Extension Operations Review on 11 March at ESOC


---
Legal disclaimer
This report is based on the ESOC mission operations report, MOR #121. Please see the copyright section of the legal disclaimer (bottom of this page) for terms of use.

Last Update: 1 September 2019
23-Apr-2024 15:08 UT

ShortUrl Portlet

Shortcut URL

https://sci.esa.int/s/A2KxZDw

Images And Videos

Related Publications

Related Links

See Also

Documentation