• → European Space Agency

    • About Science & Technology

    • For Public

    • For Educators

    • ESA

    • Science & Technology

    • LISA Pathfinder

    • Missions
    • Show All Missions
    • Mission Home
    • Summary
    • Fact Sheet
    • Objectives
    • Participants
    • Mission Team
    • Industrial Team
    • Spacecraft
    • Instruments
    • Engineering
    • Mission Operations
    • Overview
    • Mission Research
    • Resources
    • News Archive
    • Multimedia Gallery
    • Publication Archive
    • Calendar of Events
    • Services
    • Contact Us
    • Subscribe
    • Terms and Conditions
    • Bookmark and Share

    Removal of solar array protection cover

    Date: 22 Sep 2008
    Satellite: LISA Pathfinder
    Depicts: Solar array protection cover being removed from LISA Pathfinder prior to acoustic tests
    Location: ESTEC
    Copyright: ESA/Astrium

    System level acoustic tests were performed on the LISA Pathfinder spacecraft, at ESTEC, in September 2008. This photograph shows the solar array protection cover being removed prior to the tests.


    Last Update: 29 Sep 2008

    • Shortcut URL
    • http://sci.esa.int/jump.cfm?oid=43451
    • Latest selection
    • LISA Pathfinder ready to enter the test chamber
    • LISA Pathfinder in front of test chamber
    • LISA Pathfinder in front of test chamber
    • Image Hi-Res Versions
    • Hi-Res [jpg]
      6,574.06 kb.

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • Google Buzz
    • Livestream
    • Subscribe
    • App Store
    • ESA Science Twitter

    Follow ESA science

    • Copyright 2000 - 2013 © European Space Agency. All rights reserved.

    • Terms and Conditions