Asset Publisher

No. 150 - Eclipse Season

No. 150 - Eclipse Season

Report for Period 21 September to 27 September 2008Nominal operations were conducted during the reporting period. The batteries continue to perform nominally during the eclipse season that started on 19 September. As part of the routine operations, the voltage and current evolution is closely monitored during the eclipses. The eclipse season will last until 11 November.

The table below shows a chronology of the main activities:

MET (Day) Date DOY Main Activity
1048 21/09/08 265 Routine Operations
1049 22/09/08 266 Routine Operations
1050 23/09/08 267 Routine Operations
1051 24/09/08 268

Routine Operations

1052 25/09/08 269 Routine Operations
1053 26/09/08 270

Routine Operations

1054 27/09/08 271 Routine Operations

At the end of the last Cebreros pass in the reporting period (DOY 271) Venus Express was orbiting Venus at 210.6 million km from the Earth. The one-way signal travel time was 702 seconds.

Payload Activities

ASPERA
The instrument was regularly operated as part of the routine plan.

MAG
The instrument was regularly operated as part of the routine plan.

PFS
The instrument was not operated during the reporting period.

SPICAV
The instrument was regularly operated as part of the routine plan.

VeRA
No measurements were taken during the reporting period.

VIRTIS
The instrument was regularly operated as part of the routine plan.

VMC
The instrument was regularly operated as part of the routine plan.

Future Milestones

  • A Trajectory Control Manoeuvre is planned for Sunday 28 September. This manoeuvre constitutes a phase correction and is intended to keep the phasing of Venus Express in its orbit in sync with mission operations from ground.
  • High gain antenna (HGA1) S-band carrier power test is planned for 15 December 2008
  • Next quadrature phase will start on 19 December 2008

---
Legal disclaimer
This report is based on the ESOC mission operations report, MOR #150. Please see the copyright section of the legal disclaimer (bottom of this page) for terms of use.

Last Update: 1 September 2019
20-Apr-2024 03:46 UT

ShortUrl Portlet

Shortcut URL

https://sci.esa.int/s/AGL3KRw

Images And Videos

Related Publications

Related Links

See Also

Documentation