• → European Space Agency

    • About Science & Technology

    • For Public

    • For Educators

    • ESA

    • Science & Technology

    • Venus Express

    • Missions
    • Show All Missions
    • Mission Home
    • Summary
    • Fact Sheet
    • Objectives
    • Mission Team
    • Orbit View
    • Background Science
    • Venus vs Earth
    • Venus Transits
    • Spacecraft
    • 3D Model
    • Instruments
    • Engineering
    • Mission Operations…

      • Launch Vehicle
      • Launch Campaign
      • Launch Phase
      • Cruise Phase
      • Orbit Insertion
      • Operational Orbit
      • ESOC info
      • Status Reports
    • Science Operations
    • Venus Express Science Operations
    • Data Archive
    • Resources
    • News Archive
    • Multimedia Gallery
    • Publication Archive
    • Status Report Archive
    • Calendar of Events
    • Services
    • Contact Us
    • Subscribe
    • Terms and Conditions
    • Bookmark and Share

    No. 173 - Mission Update

    12 Mar 2009 16:01

    Report for Period 1 March to 7 March 2009

    The Venus Express spacecraft and payload performed nominally during this week.

    On 4 and 5 March the Cebreros antenna had to be put in stow position due to strong winds at the ground station (between 12-22 ms-1), resulting in the loss of some VMC science data as science dumps were interrupted.

    VIRTIS-M continues to be operated in the visual channels only and VIRTIS-H operations resume following the decision of the Mission Review Board held on 4 March.

    ESA's Maspalomas 15m-dish ground station, located on Gran Canaria, the Canary Islands, has been used for Venus Express tracking measurements. This was to validate the ground station for tracking of the Planck spacecraft during the mission's upcoming Launch and Early Orbit Phase (nominal launch date set for 16 April 2009). The Venus Express tracking data processed by Flight Dynamics was declared of excellent quality.

    The table below shows a chronology of the main activities:

    MET
    (Day)
    Date DOY Main Activity
    1209 01/03/09 060

    Communications pass over Cebreros

    1210 02/03/09 061

    Communications pass over Cebreros

    1211 03/03/09 062

    Communications pass over Cebreros

    1212 04/03/09 063

    Short communications pass over Cebreros due to strong local winds

    1213 05/03/09 064

    Telemetry bitrate increased to 152 kbps.
    Short communications pass over Cebreros due to strong local winds

    1214 06/03/09 065

    Communications pass over Cebreros.
    Pass started later on VSOC request.

    1215 07/03/09 066

    Communications pass over Cebreros

    At the end of the last Cebreros pass in the reporting period (DOY 066) Venus Express was orbiting Venus at 49.9 million km from the Earth. The one-way signal travel time was 166.4 seconds.

    Payload Activities

    ASPERA
    The instrument was regularly operated as part of the routine plan.

    MAG
    The instrument was regularly operated as part of the routine plan.

    PFS
    The instrument was not operated during the reporting period.

    SPICAV
    The instrument was regularly operated as part of the routine plan.

    VeRA
    No measurements were taken during the reporting period.

    VIRTIS
    VIRTIS-M was operated in the visual channels only.

    VMC
    The instrument was regularly operated as part of the routine plan.

    Future Milestones

    • Preparation for next gravity observation campaign with the Canberra ground station CAN43 on 15 April 2009.
    • Battery Deep Discharge Test is planned for 22 April 2009.
    • Start of next (outbound) quadrature phase on 29 May 2009.
    • Swap of high gain antenna (HGA) from HGA2 to HGA1 on 8 June 2009.

    ---
    Legal disclaimer
    This report is based on the ESOC mission operations report, MOR #173. Please see the copyright section of the legal disclaimer (bottom of this page) for terms of use.


    Last Update: 13 Mar 2009

    • Shortcut URL
    • http://sci.esa.int/jump.cfm?oid=44402
    • Status Reports
    • Archives

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • Google Buzz
    • Livestream
    • Subscribe
    • App Store
    • ESA Science Twitter

    Follow ESA science

    • Copyright 2000 - 2013 © European Space Agency. All rights reserved.

    • Terms and Conditions