Roll-out to the launch pad
Date: 13 May 2009 This view shows the launcher on its launch table, arriving at the Ariane launch pad after the 2.6 km journey from the final assembly building (Bâtiment d'Assemblage Final, or BAF) where the two spacecraft were mated with the launcher and the launcher was finalized.
Last Update: 14 May 2009
|
