• → European Space Agency

    • About Science & Technology

    • For Public

    • For Educators

    • ESA

    • Science & Technology

    • Rosetta

    • Missions
    • Show All Missions
    • Mission Home
    • Summary
    • Fact Sheet
    • Mission Team
    • Orbit View
    • Background Science
    • 67P/C-G
    • (2867) Steins
    • (21) Lutetia
    • Asteroids
    • Map of Lutetia
    • Orbiter
    • 3D Model
    • Instruments
    • Engineering
    • Lander
    • Instruments
    • Mission Operations
    • Mission Operations
    • Launch Vehicle
    • 2nd Rosetta Launch Campaign
    • Launch Information
    • ESOC Info
    • Science Operations
    • RSOC
    • Data Archive
    • Resources
    • News Archive
    • Multimedia Gallery
    • Publication Archive
    • Calendar of Events
    • Status Report Archive
    • Services
    • Contact Us
    • Subscribe
    • Terms and Conditions
    • Bookmark and Share

    No. 119 - Payload check-out 10

    30 Sep 2009 17:10

    Report for Period 19 September to 25 September 2009

    The reporting period covers the first week of the payload check-out 10 (PC10). The spacecraft activities were conducted according to plan. Instruments are being activated, tested, and calibrated and software updated as planned. Both the spacecraft and the ground segment are behaving nominally.

    Mission operations have been conducted with support of the ESA New Norcia (NNO) ground station.

    DOY Date Pass Main Activity
    264 21/09/09 NNO 2034

    PC10 - Dump of non interactive slot data. ROSINA and COSIMA interactive

    265 22/09/09 NNO 2035

    PC10 - ROSINA and MIDAS

    266 23/09/09 NNO 2036

    PC10 - Philae lander

    267 24/09/09 NNO 2037

    PC10 - CONSERT and Philae lander

    268 25/09/09 NNO 2038

    PC10 - ROSINA and MIDAS

    At the end of the reporting period (DoY 268) Rosetta was at 45.776 million km from Earth (0.30 AU) and the one-way signal travel time was 153 seconds. The distance to the Sun was 190.68 million km (1.27 AU).

    Spacecraft

    Payload
    Many of the instruments were activated as part of the ongoing payload check-out activities. The Standard Radiation Environment Monitor (SREM) continues to run in the background.

    ALICE
    The instrument is currently OFF. On DoY 263 an update to version 2.07 of the software in the Electrically Erasable Programmable Read Only Memory (EEPROM) page 3 was successfully performed.

    CONSERT
    The instrument is currently OFF.

    COSIMA
    The instrument is currently OFF. The test activity conducted on DoY 264 was successful and updated the software to version 14.

    GIADA
    The instrument is currently OFF. The operations conducted in the period DoY 261 to 264 were successful.

    MIDAS
    The instrument is currently OFF. Activities have been conducted as planned on DoY 265 to update the software version to 650 and perform a functional test. The tests conducted on DoY 268 were nominal.

    MIRO
    The instrument is currently OFF. A software patch was performed on DoY 262 and another patch has been uplinked to be executed in the next reporting period.

    OSIRIS
    The instrument is currently OFF. The instrument was operated between DoY 261 and 264.

    ROSINA
    The instrument is OFF. Activities have been conducted as planned on DoY 265 including the foreseen software patch (v 7.02) in EEPROM to improve functionality; the test was successful.

    RPC
    The instrument is OFF.

    RSI
    The instrument is muted.

    VIRTIS
    The instrument is currently OFF.

    LANDER Philae
    The instrument is OFF. The Lander activities started on DoY 266 with a successful extended Abbreviated Functional Test (AFT) and with a test of a software patch for the electrical subsystem.

    SREM
    Since DoY 251/2009 the accumulation settings are configured for active cruise mode.

    Future Milestones

    The payload check-out number 10 is on-going and will continue for the next week. After this densely packed operational phase, focus will shift to the navigation campaign for the mission's third and last Earth swing-by to take place on 13 November 2009. In the month preceding the Earth swing-by a re-lubrication of reaction wheel B will be performed.


    ---
    Legal disclaimer
    This report is based on the ESOC mission operations report, WOR #119. Please see the copyright section of the legal disclaimer (bottom of this page) for terms of use.


    Last Update: 12 Nov 2009

    • Shortcut URL
    • http://sci.esa.int/jump.cfm?oid=45619
    • Status Reports
    • Archives

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • Google Buzz
    • Livestream
    • Subscribe
    • App Store
    • ESA Science Twitter

    Follow ESA science

    • Copyright 2000 - 2013 © European Space Agency. All rights reserved.

    • Terms and Conditions