• → European Space Agency

    • About Science & Technology

    • For Public

    • For Educators

    • ESA

    • Science & Technology

    • Rosetta

    • Missions
    • Show All Missions
    • Mission Home
    • Summary
    • Fact Sheet
    • Mission Team
    • Orbit View
    • Background Science
    • 67P/C-G
    • (2867) Steins
    • (21) Lutetia
    • Asteroids
    • Map of Lutetia
    • Orbiter
    • 3D Model
    • Instruments
    • Engineering
    • Lander
    • Instruments
    • Mission Operations
    • Mission Operations
    • Launch Vehicle
    • 2nd Rosetta Launch Campaign
    • Launch Information
    • ESOC Info
    • Science Operations
    • RSOC
    • Data Archive
    • Resources
    • News Archive
    • Multimedia Gallery
    • Publication Archive
    • Calendar of Events
    • Status Report Archive
    • Services
    • Contact Us
    • Subscribe
    • Terms and Conditions
    • Bookmark and Share

    No. 122 - Earth swingby preparations

    04 Nov 2009 16:40

    Report for Period 17 October to 30 October 2009

    The reporting period covers two weeks of the navigation campaign leading to Rosetta's third Earth swingby on 13 November. The campaign's primary trajectory correction manoeuvre was successfully executed on DoY 295 to set the spacecraft onto the right path for the Earth swingby.

    On DoY 297 a set of tests was completed with the support of the New Norcia ground station, to characterise the performance of Rosetta's Telemetry, Tracking & Commanding system in locking the uplink signal in S-band via the spacecraft's low gain antenna (LGA). These tests help determine the uplink power level required to command the spacecraft's hibernation entry in June 2011. A further test will be performed in January 2010 with a DSN 70m antenna when the Deep Space Hibernation Mode (DSHM) will be tested.

    Mission operations have been conducted with support of the ESA New Norcia (NNO) ground station. In addition several tracking passes with the NASA DSN ground stations Goldstone (DSS-24) and Madrid (DSS-54) were taken in support of the Earth swingby navigation campaign.

    DOY Date Pass Main Activity
    290 17/10/09 NNO 2060

    Monitoring pass

    291 18/10/09 NNO 2061

    Monitoring pass

    292 19/10/09 DSS-24 2062

    Monitoring pass

    293 20/10/09

    DSS-24 2063
    NNO 2063

    Monitoring pass
    Monitoring pass

    294 21/10/09

    DSS-24 2064
    NNO 2064

    Monitoring pass
    Monitoring pass

    295 22/10/09

    DSS-24 2065
    NNO 2065

    Monitoring pass
    Trajectory control manoeuvre

    296 23/10/09

    DSS-24 2066

    Monitoring pass
    297 24/10/09 DSS-24 2067
    NNO 2067

    Monitoring pass
    Monitoring pass; LGA lock threshold test

    298 25/10/09 DSS-54 2069

    Monitoring pass

    299 26/10/09

    DSS-24 2069
    NNO 2069

    Monitoring pass
    Monitoring pass

    300 27/10/09

    NNO 2070
    DSS-54 2071

    Re-lubrication of reaction wheel B
    Monitoring pass
    301 28/10/09 NNO 2071
    DSS-54 2072

    Monitoring pass
    Monitoring pass

    302 29/10/09 DSS-24 2072
    NNO 2072

    Monitoring pass
    Sun Acquisition Sensor luminance threshold update

    303 30/10/09 DSS-24 2073
    NNO 2073

    Monitoring pass
    Monitoring pass

    At the end of the reporting period (DoY 303) Rosetta was at 11.7 million km from Earth (0.078 AU) and the one-way signal travel time was 39 seconds. The distance to the Sun was 158.7 million km (1.06 AU).

    Navigation Campaign

    On 13 November 2009 Rosetta will perform its third Earth swingby. It is the mission's fourth and final gravity assist that will boost Rosetta's orbit to place the spacecraft on a trajectory to its final destination: comet 67P/Churyumov-Gerasimenko. Closest approach to Earth is expected to occur at around 07:45:40 UTC, with Rosetta passing at an altitude of about 2481 km.

    The navigation campaign leading up to the swingby is proceeding nominally. The flight dynamics team at ESOC determines what, if any, course adjustments need to be made. Information on Rosetta's current inbound trajectory comes from telemetry transmitted by Rosetta and from Doppler and ranging data received from the ESA and NASA ground stations that are tracking the spacecraft regularly.

    Based on this data any required adjustment to the spacecraft's velocity vector is determined. To place Rosetta on the correct approach trajectory for the Earth swingby four slots were reserved for possible trajectory control manoeuvres (TCMs): at 3 weeks, 8 days, 1 day and 6 hours before closest approach.

    Trajectory Correction Manoeuvre
    On 22 October the primary trajectory correction manoeuvre (at 3 weeks before closest approach) was successfully performed. Rosetta's four 10N axial thrusters were fired for 86 seconds. The achieved change in the spacecraft's velocity vector was very close to nominal, with a delta-V of 8.8 cm/s. The successful and accurate execution of the primary TCM means that currently no further TCM is foreseen at any of the three remaining possible slots.

    The two figures below are B-plane plots illustrating the status of the navigation campaign in preparation for the third Earth swingby, after the TCM of 22 October. The B-plane is a planar coordinate system that allows targeting during a gravity assist. The target point of Rosetta's approach trajectory relative to the Earth in the B-plane is marked green in the plots below. Note: this is not the point of closest approach. Instead this virtual point corresponds to what would be Rosetta's miss-distance if the Earth had no gravity.

    The navigation error ellipses are indicated based on radiometric data up to 26 October (left) and up to and including 29 October (right).

    B-plane plot for Rosetta's third Earth swingby with the navigation  results and error ellipses up to 26 October (left, in black) and up to and including 29 October (right, in red, 10× zoom)

    Spacecraft

    Payload
    All instruments are OFF. The Standard Radiation Environment Monitor (SREM) continues to run in the background.

    ALICE
    The instrument is currently OFF.

    CONSERT
    The instrument is currently OFF.

    COSIMA
    The instrument is currently OFF.

    GIADA
    The instrument is currently OFF.

    MIDAS
    The instrument is OFF.

    MIRO
    The instrument is currently OFF.

    OSIRIS
    The instrument is OFF.

    ROSINA
    The instrument is OFF.

    RPC
    The instrument is OFF.

    RSI
    The instrument is muted.

    VIRTIS
    The instrument is currently OFF.

    LANDER Philae
    The instrument is currently OFF.
    On DoY 300 the instrument contributed to the analysis of reaction wheel B performance by acquiring data with the CASSE accelerometers.

    SREM
    Since DoY 251/2009 the accumulation settings are configured for active cruise mode.

    Future Milestones

    The navigation campaign for the spacecraft's approach to the third and last Earth swingby will continue up to Rosetta's closest approach to Earth on 13 November. The current status after the TCM on 22 October is such that no other TCM is foreseen, but the reserved TCM slots do remain available at 8 days, 1 day, and 6 hours before closest approach.

    Several of Rosetta's instruments will be activated between 6 and 9 November as part of the science observation campaign to be carried out during the Earth swingby phase.


    ---
    Legal disclaimer
    This report is based on the ESOC mission operations report, WOR #122. Please see the copyright section of the legal disclaimer (bottom of this page) for terms of use.


    Last Update: 02 Jun 2010

    • Shortcut URL
    • http://sci.esa.int/jump.cfm?oid=45860
    • Status Reports
    • Archives
    • Images and Videos
    • Earth swingby navigation campaign up to 26 Oct 2009
    • Earth swingby navigation campaign up to 29 Oct 2009

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • Google Buzz
    • Livestream
    • Subscribe
    • App Store
    • ESA Science Twitter

    Follow ESA science

    • Copyright 2000 - 2013 © European Space Agency. All rights reserved.

    • Terms and Conditions