• → European Space Agency

    • About Science & Technology

    • For Public

    • For Educators

    • ESA

    • Science & Technology

    • Venus Express

    • Missions
    • Show All Missions
    • Mission Home
    • Summary
    • Fact Sheet
    • Objectives
    • Mission Team
    • Orbit View
    • Background Science
    • Venus vs Earth
    • Venus Transits
    • Spacecraft
    • 3D Model
    • Instruments
    • Engineering
    • Mission Operations…

      • Launch Vehicle
      • Launch Campaign
      • Launch Phase
      • Cruise Phase
      • Orbit Insertion
      • Operational Orbit
      • ESOC info
      • Status Reports
    • Science Operations
    • Venus Express Science Operations
    • Data Archive
    • Resources
    • News Archive
    • Multimedia Gallery
    • Publication Archive
    • Status Report Archive
    • Calendar of Events
    • Services
    • Contact Us
    • Subscribe
    • Terms and Conditions
    • Bookmark and Share

    No. 225 - End of quadrature operations

    15 Sep 2010 17:16

    Report for Period 15 August to 11 September 2010 (week 33 - week 36)

    The reporting period, covering four weeks of Venus Express mission operations, was devoted to routine science activities and included the last quadrature operations. The swap from high gain antenna 1 (HGA1) to HGA2 and the associated 180° flip of the spacecraft around its Z-axis were successfully executed on 15 August. On 21 August, the regular DDOR measurements were made. The quadrature phase ended on 26 August. A routine orbit control manoeuvre was performed on 28 August. The current eclipse season, which started already on 30 July, will end at the start of the next reporting period.

    End of inbound quadrature
    On 26 August, Venus Express exited the quadrature phase which had started on 21 July (see also status report no. 224, linked from the right-hand menu). As part of the quadrature operations a swap was made from HGA1 to HGA2 for use during Earth communication passes. The swap took place on 15 August, just before the Cebreros communication pass.

    The reason for the high gain antenna swap is that the spacecraft attitude for continuing the use of HGA1 during Earth pointings would lead to illumination of spacecraft faces that are not designed to cope with such exposure to the Sun. HGA1 can only be used for Earth communications during the periods when the Sun-spacecraft-Earth angle is smaller than 90°. During the coming months, when this angle is greater than 90°, HGA2 will be used instead. In January 2011, in the middle of the mission's next (outbound) quadrature phase that marks the transition again to Sun-spacecraft-Earth angles of less than 90°, a swap back to HGA1 will be made.

    With the conclusion of the quadrature operations the 10° tilt on the spacecraft attitude during Earth communication periods has been removed. The fake ephemerides that were needed to maintain this tilted attitude were removed as well.

    DDOR
    On 21 August (DOY 233) delta differential one-way ranging (DDOR) was performed using two ground stations simultaneously to track the spacecraft. These measurements are performed regularly to support the accurate determination of the ephemeris for the planet Venus that is maintained by NASA's Solar System Dynamics Group.

    The DDOR measurement principle uses a technique to highly accurately determine the position of a transmitter in space and relies on observing the time delay between reception of the signal from the transmitter by two ground stations at different positions on Earth. In this case the Venus Express spacecraft was the transmitter and the two ground stations were New Norcia in west Australia and Cebreros in Avila, Spain.

    OCM
    An orbit control manoeuvre (OCM) was executed on 28 August. It was a prograde manoeuvre at apocentre, with the intention of raising the pericentre altitude by 24.4 km and increasing the orbital period by 41.4 seconds. The manoeuvre had a nominal magnitude of 1.512 m/s.

    The calibration within the orbit determination showed a slight over-performance of 1.45% (+21.9 mm/s) with a 1-sigma uncertainty of 0.07% (1.1 mm/s). The pericentre altitude was increased by 0.335 km more than planned and the orbital period was increased by 0.6 seconds more than planned.

    Summary of main activities
    During the reporting period mission operations have been conducted with the support of the ESA Cebreros ground station. The communication passes over Cebreros were performed daily. During the first two weeks, however, three Cebreros passes were skipped (DOY 229, 231 and 236) as part of the quadrature operations. In addition, Cebreros passes were regularly shortened to allow more time for science observations.

    The table below shows a chronology of the main activities:

    MET
    (Day)
    Date DOY Main Activity
    1741 15/08/10 227 Swap from HGA1 to HGA2.
    Telemetry bit rate lowered from 228 kbps to 38 kbps
    1742 16/08/10 228 Shortened Cebreros communications pass
    1743 17/08/10 229 Cebreros pass skipped
    1744 18/08/10 230 Shortened Cebreros communications pass
    1745 19/08/10 231 Cebreros pass skipped
    1747 21/08/10 233 DDOR with Cebreros and New Norcia.
    Telemetry bit rate increased to 45 kbps
    1748 22/08/10 234 Shortened Cebreros communications pass
    1749 23/08/10 235 Shortened Cebreros communications pass
    1750 24/08/10 236 Cebreros pass skipped
    1751 25/08/10 237 Shortened Cebreros communications pass
    1752 26/08/10 238 Shortened Cebreros communications pass.
    End of inbound quadrature.
    Fake ephemerides removed
    1753 27/08/10 239 Shortened Cebreros communications pass
    1754 28/08/10 240 Shortened Cebreros communications pass.
    Orbit Control Manoeuvre
    1755 29/08/10 241 Shortened Cebreros communications pass
    1756 30/08/10 242 Shortened Cebreros communications pass.
    Telemetry bit rate increased to 57 Kbps
    1757 31/08/10 243 Shortened Cebreros communications pass
    1758 01/09/10 244 Shortened Cebreros communications pass
    1764 07/09/10 250 Cebreros pass shortened for Mars Express
    1767 10/09/10 253 Telemetry bit rate increased to 76 Kbps.
    Cebreros pass shortened for Mars Express

    MET = Mission elapsed time; DOY = Day of year

    At the end of the last Cebreros pass in the reporting period (DOY 254) Venus Express was orbiting Venus at 76 million km from the Earth. The one-way signal travel time was 253 seconds.

    Payload Activities

    ASPERA
    The instrument was regularly operated as part of the routine plan.

    MAG
    The instrument was regularly operated as part of the routine plan.

    PFS
    The instrument was not operated during the reporting period.

    SPICAV
    The instrument was regularly operated as part of the routine plan.

    VeRa
    No radio science observations were made during the reporting period.


    VIRTIS
    VIRTIS-M was operated in the visual channels only.

    VMC
    The instrument was regularly operated as part of the routine plan.

    Future Milestones

    • 13 September 2010: End of eclipse season
    • October 2010: Atmospheric drag experiment campaign #4
    • 29 October 2010: Venus at inferior conjunction
    • 31 December 2010: Start of outbound quadrature phase


    ---
    Legal disclaimer
    This report is based on four ESOC mission operations reports, MOR #249 through #252. Please see the copyright section of the legal disclaimer (bottom of this page) for terms of use.


    Last Update: 13 Jan 2012

    • Shortcut URL
    • http://sci.esa.int/jump.cfm?oid=47713
    • Status Reports
    • Archives
    • See also
    • Venus Express Status Report no. 224

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • Google Buzz
    • Livestream
    • Subscribe
    • App Store
    • ESA Science Twitter

    Follow ESA science

    • Copyright 2000 - 2013 © European Space Agency. All rights reserved.

    • Terms and Conditions