European contributions to LISA Pathfinder
ESA's LISA Pathfinder, a mission to validate the technology needed for the first generation of space-based gravitational wave detectors, is being built by an industrial team led by the prime contractor, Astrium Ltd.
Astrium GmbH is responsible for providing the integrated LISA Technology Package (LTP) payload. The subsystems for the LTP are provided by a consortium of European companies and research institutes.
The tables below list the industrial team involved in the LISA Pathfinder mission, arranged by country and company name.
|
Table 1: European contributions to the LISA Pathfinder spacecraft |
|

|
Austria
|
|
Austrian Aerospace (RUAG)
|
Thermal HW
|
|
Austrian Research Center
|
Subcontracted contribution to the Needle Field Emission Electric-Propulsion (FEEP) Technology
|
|
Siemens AG.OESTERREICH
|
Radio Frequency Special Check-out Equipment
|
|

|
Belgium
|
|
SpaceBel
|
On Board SW subcontractor
|
|
Thales Alenia Space |
Power Subsystem Special Check-out Equipment
|
|

|
Denmark
|
|

|
Finland
|
|
FINNISH METEOROLOGICAL INSTITUTE
|
Electrical Propulsion Diagnostic package subcontractor
|
|
PATRIA AVIATION OY SYSTEMS
|
Solar Array subcontractor
|
|

|
France
|
|
Astrium SAS
|
Subcontracted contribution to the Needle Field Emission Electric-Propulsion (FEEP) Technology
|
|
European Test Services |
Environmental Tests
|
|
Thales Alenia Space France (TAS-F)
|
Solar Array
|
|

|
Germany
|
|
EADS Astrium – Friedrichshafen
|
DFACS
|
|
EADS Astrium – Friedrichshafen
|
On Board Computer
|
|
EADS Astrium – Friedrichshafen |
Subcontracted contribution to the Needle Field Emission Electric-Propulsion (FEEP) Technology
|
|
EADS Space Transportation – Lampoldshausen
|
Subcontracted contribution to the Needle Field Emission Electric-Propulsion (FEEP) Technology
|
|
EUROCKOT |
Feasibility studies for the LISA PF Launch Service on Rockot
Launch Vehicle
|
|
European Test Services
|
Environmental Tests
|
|
IABG |
Environmental Tests
|
|
IFR, University of Stuttgart |
DFACS
|
|
RWE AZURSPACE SOLAR POWER GMBH
|
Solar Array subcontractor
|
|
ZARM
|
DFACS subcontractor
|
|

|
Italy
|
|
Alta Spa
|
FEEP subcontractor
|
|
Selex Galileo
|
Digital Sun sensor
|
|
Selex Galileo
|
Field Emission Electric Propulsion (FEEP) Prime
|
|
Selex Galileo |
Solar Array subcontractor
|
|
Thales Alenia Space Italia SpA (TAS-I)
|
Electrical Propulsion Diagnostic package
|
|
Thales Alenia Space Italia SpA (TAS-I)
|
Neutraliser
|
|
Thales Alenia Space Italia SpA (TAS-I) |
Transponders
|
|

|
Netherlands
|
|
Satellite Services BV
|
Radio Frequency SCOE subcontractor
|
|
European Test Services
|
Environmental Tests
|
|

|
Norway
|
|
DET NORSKE VERITAS
|
Independent Software Verification and Validation (ISVV) facility
|
|

|
Portugal
|
|
CRITICAL SOFTWARE SA
|
Independent Software Verification and Validation (ISVV) facility subcontractor
|
|

|
Spain
|
|
EADS CASA Espacio
|
Harness
|
|
ALTER
|
Parts Procurement Agent
|
|
Rymsa |
Low Gain Antenna and Medium Gain Antenna
|
|
EADS Astrium Crisa
|
Power Conditioning and Distribution Unit (PCDU)
|
|
EADS Astrium Crisa
|
On Board Computer subcontractor
|
|

|
United Kingdom
|
|
ABSL
|
Batteries
|
|
Scisys Ltd
|
On Board SW
|
|
Astrium Ltd |
Spacecraft System Prime COntractor
|
|

|
Sweden
|
|
RUAG AEROSPACE AB
|
Separation system
|
|

|
Switzerland
|
|
Ruag Aerospace
|
Subcontracted contribution to the Slit Field Emission Electric-
-Propulsion (FEEP) Technology
|
|
Ruag Aerospace
|
Science Spacecraft Structure
|
|
Table 2: European contributions to the LISA Pathfinder Lisa Technology Package |
|

|
Austria
|
|
MAGNA STEYR
|
Caging Mechanism
|
|

|
France
|
|
APC Université Paris
|
Laser Modulator
|
|

|
Germany
|
|
AEI, Hannover
|
Co-PI, Interferometer design
|
|
Astrium GmbH
|
LTP Architect
|
|
Kaiser Threde
|
Laser Assembly
|
|
Tesat (D) / Max Planck Albert Einstein Institute |
Reference Laser Unit
|
|

|
Italy
|
|
University of Trento
|
PI, Inertial Sensor Design
|
|
CGS
|
Inertial Sensor Subsystem
|
|
Thales Alenia Space |
Test Mass Electrode Housing
|
|
DTM SRL
|
Caging Mechanism subcontractor
|
|

|
Netherlands
|
|
SRON
|
ISS Check Out Equipment
|
|

|
Spain
|
|
GMV
|
Independent Software Verification and Validation
|
|
Instituto de Ciencias del Espacio
|
Data Management Unit
|
|
University of Barcelona
|
Data Diagnostic System
|
|
NTE – SENER |
Data Management Unit subcontractor
|
|

|
Switzerland
|
|
ETH Zurich/ RUAG (CH)
|
ISS Front End Electronics
|
|
Laser Modulator subcontractor
|
|
RUAG AEROSPACE
|
Caging Mechanism
|
|

|
United Kingdom
|
|
University of Birmingham
|
Phasemeter Assembly
|
|
MSSL
|
Photodiodes
|
|
University of Glasgow
|
Optical Bench
|
|
Interferometer
|
|
Imperial College London |
Charge Management System
|
Last Update: 24 Apr 2013