• → European Space Agency

    • About Science & Technology

    • For Public

    • For Educators

    • ESA

    • Science & Technology

    • Rosetta

    • Missions
    • Show All Missions
    • Mission Home
    • Summary
    • Fact Sheet
    • Mission Team
    • Orbit View
    • Background Science
    • 67P/C-G
    • (2867) Steins
    • (21) Lutetia
    • Asteroids
    • Map of Lutetia
    • Orbiter
    • 3D Model
    • Instruments
    • Engineering
    • Lander
    • Instruments
    • Mission Operations
    • Mission Operations
    • Launch Vehicle
    • 2nd Rosetta Launch Campaign
    • Launch Information
    • ESOC Info
    • Science Operations
    • RSOC
    • Data Archive
    • Resources
    • News Archive
    • Multimedia Gallery
    • Publication Archive
    • Calendar of Events
    • Status Report Archive
    • Services
    • Contact Us
    • Subscribe
    • Terms and Conditions
    • Bookmark and Share

    No. 156 - Preparations for deep-space hibernation phase

    31 May 2011 14:00

    Report for the period 18 April to 15 May 2011

    This report covers 28 days of Rosetta mission operations. The main activities were further preparations for the deep space hibernation phase.

    During the reporting period, Rosetta went through a solar opposition phase with a consequent very low level of activities. Due to the extremely large heliocentric distance, the opposition conditions did not affect the performance of the telemetry and telecommand subsystem. Further activities were performed in preparation for the deep space phase. The spacecraft is currently entering the final preparatory phase for entry into hibernation.

    During the reporting period, mission operations were conducted using the ESA New Norcia (NNO) ground station.

    Main activities during reporting period

    DoY Date Pass Activity
    108 18-Apr-2011 NNO 2610 Monitor
    110 20-Apr-2011 NNO 2612 Monitor
    111 21-Apr-2011 NNO 2613 Monitor
    113 23-Apr-2011 NNO 2615 Monitor
    115 25-Apr-2011 NNO 2617 Monitor
    117 27-Apr-2011 NNO 2619 Monitor
    118 28-Apr-2011 NNO 2620 Characterisation of outgasing from -Z face
    120 30-Apr-2011 NNO 2622 Monitor
    122 2-May-2011 NNO 2624 Batteries discharge to level 2 for solar arrays test
    124 4-May-2011 NNO 2626 Monitor
    125 5-May-2011 NNO 2627 Monitor
    127 7-May-2011 NNO 2629 Monitor
    129 9-May-2011 NNO 2631 Update of thermal control system tables in safeguard memory
    131 11-May-2011 NNO 2633 Monitor
    132 12-May-2011 NNO 2634 Monitor
    133 13-May-2011 NNO 2635 Characterisation of S-band RX-1 band-limiting filter
    134 14-May-2011 NNO 2636 Monitor

    DoY = Day of year

    At the end of the reporting period on 15 May, Rosetta was 508 million kilometres from Earth (3.39 AU); one-way signal travel time was 1695 seconds (28 minutes 15 seconds). The distance from the Sun was 654 million kilometres (4.37 AU). On 19 April, Rosetta was at a geocentric distance of about 492 million kilometres; the spacecraft will not be so 'close' to Earth again until the end of October 2014.

    Spacecraft

    Payload Status
    ALICE The instrument is currently OFF.
    CONSERT The instrument is currently OFF.
    COSIMA The instrument is currently OFF.
    GIADA The instrument is currently OFF.
    MIDAS The instrument is currently OFF.
    MIRO The instrument is currently OFF.
    OSIRIS The instrument is currently OFF.
    ROSINA The instrument is currently OFF.
    RPC The instrument is currently OFF.
    RSI The USO is ON/muted since 3 February 2010 (DoY 032/2010).
    VIRTIS The instrument is currently OFF.
    Lander (Philae) The instrument is currently OFF.
    SREM The instrument is ON with standard settings since 3 February 2010 (DoY 032/2010).

    Future Milestones

    With the exception of a final solar array performance test, spacecraft activities preceding the hibernation phase have now been completed. Configuration for the hibernation phase will take place during the next reporting period, with a progressive deactivation of unneeded units and activation of those required for entry operations.

    Summary of upcoming events:

    • 20 May 2011: End of opposition phase
    • 21 May 2011: Solar arrays test at 4.4 AU
    • 23 May 2011: Solid-state mass memory configuration for low power conditions (one memory module); Start of power management for antenna pointing mechanism electronics /solar array drive electronics (repositioning)
    • 30 May 2011: Switch on second inertial measurement package
    • 31 May 2011: Power consumption characterisation test
    • 01 June 2011: Low-gain antenna telecommand links test (NASA Deep Space Network Canberra and ESA New Norcia ground stations); Safe mode configuration for low power conditions (Low power flag)
    • 08 June 2011: Hibernation entry

    ---
    Legal disclaimer
    This report is based on the ESOC mission operations report, WOR #156. Please see the copyright section of the legal disclaimer (linked from the home page http://sci.esa.int) for terms of use.


    Last Update: 17 Mar 2013

    • Shortcut URL
    • http://sci.esa.int/jump.cfm?oid=49821
    • Status Reports
    • Archives

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • Google Buzz
    • Livestream
    • Subscribe
    • App Store
    • ESA Science Twitter

    Follow ESA science

    • Copyright 2000 - 2013 © European Space Agency. All rights reserved.

    • Terms and Conditions