• → European Space Agency

    • About Science & Technology

    • For Public

    • For Educators

    • ESA

    • Science & Technology

    • BepiColombo

    • Missions
    • Show All Missions
    • Mission Home
    • Summary
    • Fact Sheet
    • Objectives
    • Background Science
    • Background Science
    • Mercury Interior
    • Mercury Surface
    • Mercury Atmosphere
    • General Relativity
    • Mercury Planetary Orbiter
    • Spacecraft
    • Instruments
    • Mercury Magnetospheric Orbiter
    • Spacecraft
    • Instruments
    • Mission Operations
    • Getting to Mercury
    • Resources
    • News Archive
    • Multimedia Gallery
    • Publication Archive
    • Journal Archive
    • Calendar of Events
    • Services
    • Contact Us
    • Subscribe
    • Terms and Conditions
    • Bookmark and Share

    View of the interface between the BepiColombo Mercury Planetary Orbiter and the Mercury Transfer Module during mating

    Date: 27 Apr 2012
    Satellite: BepiColombo
    Depicts: The interface between the MPO and the MTM during mating
    Location: Test Centre, ESTEC, Noordwijk, Netherlands
    Copyright: ESA/Anneke Le'Floch

    Close-up view of the interface between the BepiColombo Mercury Planetary Orbiter (MPO) Structural and Thermal Model (STM) and the Mercury Transfer Module (MTM) during mating.

    The reason for the temporary mating of the spacecraft on 11 April 2012 was to allow the precise positioning of the Inter-Module Hardware (IMH) on the MTM 'top' (–Z) panel. The IMH is fixed to the MTM using bolts, but these are only designed to bear longitudinal stresses – that is, those due to forces acting perpendicular to the plane of the interface. Stresses due to lateral forces – those acting in the plane of the interface – will be borne by 'shear pins', since the friction between the IMH and the panels to which it is attached will be insufficient; the shear pins also increase the stiffness of the overall interface. In order for the shear pins to fulfil their function of preventing slippage at the IMH/panel interface, and also to ensure that they can be removed and replaced during ground operations, very tight tolerances are specified for the size and location of the holes that they fit into. This tight tolerance for the holes in the MTM –Z panel requires that the MPO with its IMH hardware attached be used as the ‘template’ for determining their position.


    Last Update: 27 Apr 2012

    • Shortcut URL
    • http://sci.esa.int/jump.cfm?oid=50313
    • Latest selection
    • Closing the door of the Phenix thermal vacuum facility with the BepiColombo MPO MPB inside
    • Closing the thermal shroud around the BepiColombo MPO MPB inside the Phenix facility
    • The BepiColombo MPO MPB inside the Phenix thermal vacuum facility
    • Image Hi-Res Versions
    • Hi-Res [jpg]
      766.75 kb.
    • See also
    • BepiColombo Planetary Orbiter and Transfer Module mated

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • Google Buzz
    • Livestream
    • Subscribe
    • App Store
    • ESA Science Twitter

    Follow ESA science

    • Copyright 2000 - 2013 © European Space Agency. All rights reserved.

    • Terms and Conditions