custom 25-May-2013 11:15:07

Journal Archive

Search Results:

  | 1 |   [Refine Search]
2 items found  page 1 of 1
#05: BepiColombo Planetary Orbiter and Transfer Module mated for first time
The Structural and Thermal Models of the BepiColombo Mercury Planetary Orbiter and Mercury Transfer Module were mated for the first time on 11 April 2012. The mating was performed to accurately position the inter-module hardware on the transfer module.
Date: 27 Apr 2012
#03: Gaia Basic Angle Monitor delivered for integration
The protoflight models of the two Basic Angle Monitor (BAM) Opto-Mechanical Assembly (OMA) bars have been delivered to the spacecraft Prime Contractor and are being prepared for integration into the Payload Module (PM).
Date: 11 Apr 2012
 
  | 1 |   [Refine Search]
2 items found  page 1 of 1
 

Last Update: 04 August 2008

For further information please contact: SciTech.editorial@esa.int