|
|
| No. 167 - Quadrature Operations |
Report for Period 18 January to 24 January 2009 Nominal operations were conducted during the reporting period. The spacecraft is still in quadrature phase, performing communications passes in a tilted configuration since 19 December 2008. |
| Date: 30 Jan 2009 |
|
|
| No. 109 - Superior Conjunction Phase |
Report for Period 6 December 2008 to 16 January 2009
The reporting period covers six weeks of operations, during which Rosetta successfully passed the superior conjunction phase. The angular separation between the Earth and the Sun as seen from the spacecraft stayed below 3° (conjunction) between 17 December 2008 and 6 January 2009, with the minimum angular separation occurring on 27 December. |
| Date: 22 Jan 2009 |
|
|
| No. 166 - Swap to High Gain Antenna 2 |
Report for Period 11 january to 17 January 2009 Nominal operations were conducted during the reporting period. The spacecraft is still in quadrature phase, performing communications passes in a tilted configuration since 19 December 2008. On 13 January the High Gain Antenna (HGA) swap from HGA1 to HGA2 was executed.
|
| Date: 22 Jan 2009 |
|
|
| No. 165 - Quadrature Operations |
Report for Period 4 January 2009 to 10 January 2009
Nominal operations were conducted during the reporting period. The spacecraft is still in quadrature phase, performing communications passes in a tilted configuration since 19 December 2008.
|
| Date: 14 Jan 2009 |
|
|
| No. 164 - Quadrature Operations |
Report for Period 28 December 2008 to 3 January 2009
Nominal operations were conducted during the reporting period. The spacecraft is currently in quadrature phase, when the Sun-Spacecraft-Earth angle is between 75° and 95°. |
| Date: 06 Jan 2009 |
|
|