Status Report Archive

Search Results:

  | 1 |   [Refine Search]
4 items found  page 1 of 1
No. 150 - First rendezvous manoeuvre

Report for the period 17 to 24 January 2011

This report covers 8 days of Rosetta mission operations. During the reporting period about 98 per cent of the first rendezvous manoeuvre (RDVM#1, total DV ~ 780 ms-1) was completed with a sequence of six burns.

Date: 31 Jan 2011
Herschel Status Report - January 2011

Report for period 9 December 2010 to 20 January 2011

Mission operations of the Herschel space observatory continued nominally during the reporting period, with the spacecraft and subsystems all performing as expected. The first observations from the first in-flight Open Time (OT1) programmes have been carried out.

Date: 25 Jan 2011
No. 149 - Preparations for first rendezvous manoeuvre

Report for the period 18 December 2010 to 16 January 2011

This report covers 30 days of Rosetta mission operations. The spacecraft has been fully configured for the execution of the first rendezvous manoeuvre, planned to start on 17 January.

Date: 21 Jan 2011
No. 229 - Start of outbound quadrature phase

Report for the period 5 December 2010 to 1 January 2011 (week 49 - week 52)

The reporting period, covering four weeks of Venus Express mission operations, was devoted to routine science activities.

Date: 18 Jan 2011
 