| No. 154 - Eclipse Season |
Report for Period 19 October to 25 October 2008
Nominal operations were conducted during the reporting period. The batteries continue to perform nominally during the eclipse season that started on 19 September and will end on 11 November. |
| Date: 29 Oct 2008 |
|
|
| No. 153 - Eclipse Season |
Report for Period 12 October to 18 October 2008 Nominal operations were conducted during the reporting period. The batteries continue to perform nominally during the eclipse season that started on 19 September. |
| Date: 21 Oct 2008 |
|
|
| No. 152 - Eclipse Season |
Report for Period 5 October to 11 October 2008 Nominal operations were conducted during the reporting period. The batteries are performing nominally since the start of the eclipse season on 19 September. |
| Date: 15 Oct 2008 |
|
|
| No. 106 - Gravitational Microlensing Observations Completed |
Report for Period 20 September 2008 to 5 October 2008 The reporting period covers two weeks of activities mainly dedicated to the OSIRIS gravitational microlensing event observations. |
| Date: 10 Oct 2008 |
|
|
| No. 151 - Trajectory Control Manoeuvre |
Report for Period 28 September to 4 October 2008 Nominal operations were conducted during the reporting period. The batteries are performing nominally during the regular eclipses in the current eclipse season. |
| Date: 08 Oct 2008 |
|
|
| No. 150 - Eclipse Season |
Report for Period 21 September to 27 September 2008 Nominal operations were conducted during the reporting period. The batteries continue to perform nominally during the eclipse season that started on 19 September. As part of the routine operations, the voltage and current evolution is closely monitored during the eclipses. The eclipse season will last until 11 November. |
| Date: 01 Oct 2008 |
|
|