custom 25-May-2013 04:38:05

Status Report Archive

Search Results:

  | 1 |   [Refine Search]
4 items found  page 1 of 1
No. 148 - Pre-hibernation payload checkout

Report for the period 27 November to 17 December 2010

This report covers 21 days of Rosetta mission operations. The final payload checkout before the hibernation phase was successfully conducted during the reporting period; all the activities were conducted according to plan and only minor actions remain to be performed in the coming months.

Date: 23 Dec 2010
No. 228 – Start of eclipse season

Report for the period 7 November to 4 December 2010 (week 45 - week 48)

The reporting period, covering four weeks of Venus Express mission operations, was devoted to routine science activities.

Date: 22 Dec 2010
Herschel Status Report - December 2010

Report for period 18 November to 9 December 2010

Mission operations of the Herschel space observatory continued nominally during the reporting period, with the spacecraft and subsystems all performing as expected.

Date: 14 Dec 2010
No. 147 - RF test for deep-space hibernation mode entry

Report for the period 15 to 26 November 2010

This report covers 12 days of Rosetta mission operations. During the reporting period, the final RF test for the entry into deep-space hibernation mode (DSHM) was successfully conducted, confirming the capability of the ground segment to command the hibernation entry with back-up options.

Date: 03 Dec 2010
 
  | 1 |   [Refine Search]
4 items found  page 1 of 1
 

Last Update: 04 August 2008

For further information please contact: SciTech.editorial@esa.int