custom 19-May-2013 07:36:23

Status Report Archive

Search Results:

  | 1 | 2 | 3 | 4 | 5 |   [Refine Search]
82 items found  page 5 of 5
No. 165 - Quadrature Operations

Report for Period 4 January 2009 to 10 January 2009

Nominal operations were conducted during the reporting period. The spacecraft is still in quadrature phase, performing communications passes in a tilted configuration since 19 December 2008.

Date: 14 Jan 2009
No. 164 - Quadrature Operations

Report for Period 28 December 2008 to 3 January 2009

Nominal operations were conducted during the reporting period. The spacecraft is currently in quadrature phase, when the Sun-Spacecraft-Earth angle is between 75° and 95°.

Date: 06 Jan 2009
 
  | 1 | 2 | 3 | 4 | 5 |   [Refine Search]
82 items found  page 5 of 5
 

Last Update: 04 August 2008

For further information please contact: SciTech.editorial@esa.int