No. 117 - Routine Operations
Report for Period 03 February to 09 February 2008

Routine activities were carried out during the reporting period apart from a brief entry into safe mode.

Date: 12 Feb 2008
No. 116 - Routine Operations
Report for Period 27 January to 02 February 2008

Routine activities were carried out during the reporting period apart from a brief entry into safe mode.

Date: 05 Feb 2008
No. 115 - Routine Operations
Report for Period 20 January to 26 January 2008

Routine activities were carried out during the reporting period.

Date: 29 Jan 2008
No. 114 - Routine Operations
Report for Period 13 January to 19 January 2008

Routine activities were carried out during the reporting period.

Date: 22 Jan 2008
No. 113 - Routine Operations
Report for Period 06 January to 12 January 2008

Routine activities were carried out during the reporting period.

Date: 15 Jan 2008
No. 112 - Routine Operations
Report for Period 30 December 2007 to 05 January 2008

Routine activities were carried out during the reporting period.

Date: 08 Jan 2008
No. 111 - Routine Operations
Report for Period 23 December to 29 December 2007

It took several days to download the VIRTIS data stored onboard the spacecraft after the problems at Cebreros reported in the previous week.

Date: 02 Jan 2008
No. 110 - Routine Operations
Report for Period 16 December to 22 December 2007

The activities during this week cover routine operations. In addition, heavy snow fall in Cebreros caused some problems with data download. The data was eventually downloaded in the subsequent days.

Date: 27 Dec 2007
No. 109 - Routine Operations
Report for Period 09 December to 15 December 2007

The activities during this week cover routine operations

Date: 18 Dec 2007
No. 106 - End of Quadrature Operations
Report for Period 18 November to 24 November 2007

The activities during this week cover routine operations, skipping passes for cooling purposes and the end of the Quadrature Phase on 23 November. VIRTIS operations have continued during the period.

Date: 12 Dec 2007
No. 108 - Routine Operations
Report for Period 02 December to 08 December 2007

The activities during this week cover routine operations

Date: 11 Dec 2007
No. 107 - Routine Operations
Report for Period 25 November to 01 December 2007

Routine mission operations were carried out during the reporting period.

Date: 04 Dec 2007
No. 105 - Quadrature Operations
Report for Period 11 November to 17 November 2007

The activities during this week cover routine operations in Quadrature. These operations are severely constrained due to the special thermal restrictions that apply during Quadrature phase. VIRTIS operations were resumed in this period.

Date: 28 Nov 2007
Venus Express Status Report - November 2007
An anomaly in the solar array drive circuitry, already known on Mars Express, was detected on Venus Express for the first time on 23 August 2007. Within 24 hours the error happened twice. This resulted in a three day stop of all science operations. It was decided to implement the Mars Express patch to solve the problem. Following the trigger of the same event for the -Y wing on 18 September, the patch was also enabled for that wing. Since then S/C operations have been performed nominally.
Date: 19 Nov 2007
No. 104 - Quadrature Operations

Report for the Period 4 November to 10 November 2007

The activities during this week cover routine operations in Quadrature. These operations are severely constrained due to the special thermal restrictions that apply during Quadrature phase. VIRTIS operations were resumed in this period.

Date: 13 Nov 2007
No. 103 - Ongoing Quadature Operations

Report for the Period 28 October to 3 November 2007

The activities during this week cover routine operations in Quadrature. These operations are severely constrained due to the special thermal restrictions that apply during Quadrature phase. The swap from HGA2 to HGA1 was also carried out this week.

Date: 07 Nov 2007
No. 102 - Quadrature Operations

Report for the Period 21 October to 27 October 2007

Following last week's entry in Quadrature phase, the activities during this week cover routine operations in Quadrature. These operations are severely constrained due to the special thermal restrictions that apply during Quadrature phase.

Date: 29 Oct 2007
No. 101 - Mission Progress
Report for Period 14 October to 20 October 2007

The Main activity during this week has been the entrance in Quadrature on the 19 October 2007. The procedure was fully automated as part of the routine plan following the experience of the previous quadrature. The fake ephemeris was again applied in GSP before the AOS in Cebreros.

Date: 24 Oct 2007
No. 100 - Mission Latest
Report for Period 7 October to 13 October 2007

Routine observations took place during this reporting period.

Date: 18 Oct 2007
No. 99 - Mission Update
Report for Period 30 September to 6 October 2007

Routine observations took place during this reporting period.

Date: 11 Oct 2007
 