No. 114 - Routine Operations |
|
|
22 January 2008 Report for Period 13 January to 19 January 2008Routine activities were carried out during the reporting period.
The table below shows a chronology of the main activities in the reporting period:
At the end of the last Cebreros pass in the reporting period (DOY 019, 12:00z) Venus Express was orbiting Venus at 189.2 million km from the Earth. The one-way signal travel time was 630 seconds. Payload ActivitiesASPERA MAG PFS SPICAV VeRA VIRTIS VMC Future Milestones
|
||||||||||||||||||||||||||||||||