Asset Publisher

MIRI Cryogenic Performance Testing

MIRI Cryogenic Performance Testing


Date: 09 October 2007
Satellite: JWST
Depicts: MIRI verification model fully assembled on its support equipment
Location: RAL, Oxfordshire, UK
Copyright: MIRI European Consortium/RAL

The Mid-InfraRed Instrument (MIRI) verification model is fully assembled and ready for undergoing its cryogenic performance test at the Rutherford Appleton Laboratory (RAL) in Oxfordshire. Here the fully assembled instrument is seen on its support equipment.
Last Update: 1 September 2019
11-Nov-2024 20:06 UT

ShortUrl Portlet

Shortcut URL

https://sci.esa.int/s/WyG2NqA

Also Available As

Related Images

Related Videos

Related Publications

Related Links

Documentation