Report for Period 9 March to 15 March 2008Routine operations continued nominally as planned.
Published: 18 March 2008
Mission StatusThe spacecraft and its subsystem continue to perform nominally. Until mid-September the spacecraft was in active cruise mode with high activity level due to the 6th Active Payload Checkout.
Published: 18 March 2008
Mission StatusContact with TC-2 (the polar spacecraft), which was lost early August 2007 was successfully re-established in November. The spacecraft is in good shape and the European instruments (FGM magnetometer, PEACE electron sensor, and NUADU Neutral Imager) were switched on successfully.
Published: 18 March 2008
Mission StatusThe recent long eclipse season - the most critical period of the Cluster mission since the launch in 2000 - has been passed successfully.
Published: 18 March 2008
Mission Status XMM-Newton operations are continuing smoothly with the spacecraft, instruments and ground segment all performing nominally.
Published: 18 March 2008
Overall Mission, Payload, and Science Planning StatusOn 2 October 2007 Mars Express successfully performed a close flyby of Phobos coming to within ~140 km of the moon. During the flyby a number of the HRSC observations were unfortunately lost due to an overload of the system. The impact of this is relatively small as HRSC already has acquired a...
Published: 18 March 2008
Mission StatusActivities relating to the exit from the quadrature period were successfully concluded. VIRTIS operations were resumed on 4 November 2007. Data from the first measurements show the situation on the cryo-cooler motor current to slowly improve again. The scientific data are of the same quality as before.
Published: 18 March 2008
Mission StatusINTEGRAL operations are continuing smoothly with the spacecraft, instruments and ground segment all performing nominally.
Published: 18 March 2008
Report for Period 2 March to 8 March 2008Routine operations continued nominally as planned.
Published: 12 March 2008
Report for Period 24 February to 1 March 2008Routine operations continued nominally as planned.
Published: 4 March 2008
Report for Period 17 February to 23 February 2008Routine operations continued nominally as planned.
Published: 27 February 2008
Report for Period 10 February to 16 February 2008Routine activities were carried out during the reporting period apart from a brief entry into safe mode.
Published: 19 February 2008
Report for Period 19 January to 15 February 2008Rosetta is continuing its 4th orbit around the Sun as part of its interplanetary journey. Thespacecraft distance from the Sun will now increase to reach a maximum of ca. 2.26 AU in December 2008.
Published: 19 February 2008
Report for Period 03 February to 09 February 2008Routine activities were carried out during the reporting period apart from a brief entry into safe mode.
Published: 12 February 2008
Report for Period 27 January to 02 February 2008Routine activities were carried out during the reporting period apart from a brief entry into safe mode.
Published: 5 February 2008
Report for Period 20 January to 26 January 2008Routine activities were carried out during the reporting period.
Published: 29 January 2008
Report for Period 13 January to 19 January 2008Routine activities were carried out during the reporting period.
Published: 22 January 2008
Report for Period 22 December 2007 to 18 January 2008Rosetta is continuing its 4th orbit around the Sun as part of its interplanetary journey. Thespacecraft distance from the Sun will now increase to reach a maximum of ca. 2.26 AU in December 2008.
Published: 22 January 2008
Early on 15 January, at the start of a routine test in preparation for the next phase of the Ulysses mission, communication with the spacecraft via the onboard X-band transmitter was lost. As a result, the Spacecraft Operations Team declared a Spacecraft Emergency in order to obtain additional ground station coverage from NASA's Deep Space...
Published: 17 January 2008
Report for Period 06 January to 12 January 2008Routine activities were carried out during the reporting period.