Report for the period 16 September to 13 October 2012This reporting period covers four weeks of Venus Express operations, including tests with ESA's new ground station at Malargüe, the end of the thirteenth occultation season and the start of the twenty-second solar eclipse season.
Published: 3 January 2013
Report for the period 19 August to 15 September 2012This reporting period covers four weeks of Venus Express operations, including high-accuracy spacecraft ranging using ESA's new ground station at Malargüe; the end of the ninth Atmospheric Drag Experiment campaign followed by two orbit correction manoeuvres; the end of quadrature operations;...
Published: 21 December 2012
Report for the period 22 July to 18 August 2012This reporting period covers four weeks of Venus Express operations, from 22 July to 18 August 2012. It includes the start of the ninth Atmospheric Drag Experiment Campaign, the continuation of the thirteenth occultation season, start of the quadrature season, observations of comet Machholz and...
Published: 20 December 2012
Report for period 27 October to 5 December 2012Mission operations of the Herschel space observatory continued nominally during the reporting period, with the spacecraft and subsystems all performing as expected. The Herschel Post-operations Readiness Review presentations to the Review Board took place on 30 October. The planning for the...
Published: 11 December 2012
Report for the period 24 June 2012 to 21 July 2012This reporting period covers four weeks of Venus Express operations. This period included the continuation of the mission's longest period of Earth occultations, the continuation and end of solar eclipse season 21, and two orbit correction manoeuvres.
Published: 22 November 2012
Report for the period 27 May 2012 to 23 June 2012This reporting period covers four weeks of Venus Express operations, including the transit of Venus during inferior conjunction, the continuation of the mission's longest Earth occultation season, and the start of the twenty-first eclipse season.
Published: 6 November 2012
Report for period 3 to 26 October 2012Mission operations of the Herschel space observatory continued nominally during the reporting period, with the spacecraft and subsystems all performing as expected.
Published: 30 October 2012
Report for the period 29 April 2012 to 26 May 2012This reporting period covers four weeks of Venus Express operations, including routine planned operations, two orbit correction manoeuvres, the end of the eighth Atmospheric Drag Experiment (ADE) campaign, and the continuation of the mission's longest Earth occultation season.
Published: 11 October 2012
Report for period 30 August to 2 October 2012Mission operations of the Herschel space observatory continued nominally during the reporting period, with the spacecraft and subsystems all performing as expected.
Published: 5 October 2012
Report for period 5 July to 29 August 2012Mission operations of the Herschel space observatory continued nominally during the reporting period, with the spacecraft and subsystems all performing as expected.
Published: 5 September 2012
Report for the period 1 April to 28 April 2012This reporting period covers four weeks of Venus Express operations, including the end of special operations for a quadrature season, routine planned operations at low telemetry downlink data rates, the end of the twentieth solar eclipse season, the start of the eighth Atmospheric Drag Experiment...
Published: 23 August 2012
Report for the period 4 March to 31 March 2012This reporting period covers four weeks of Venus Express operations, including routine planned operations at maximum and minimum telemetry downlink data rates, the continuation of the twentieth eclipse season, and the beginning of the mission's longest Earth occultation season. Additionally, the...
Published: 17 August 2012
Report for period 21 June to 4 July 2012Mission operations of the Herschel space observatory continued nominally during the reporting period, with the spacecraft and subsystems all performing as expected.
Published: 11 July 2012
Report for period 2 May to 20 June 2012Mission operations of the Herschel space observatory continued nominally during the reporting period, with the spacecraft and subsystems all performing as expected.
Published: 29 June 2012
Report for period 5 April to 1 May 2012Mission operations of the Herschel space observatory continued nominally during the reporting period, with the spacecraft and subsystems all performing as expected.
Published: 9 May 2012
Report for the period between 5 February and 3 March 2012 This reporting period covers four weeks of Venus Express operations. It includes routine planned operations at moderate but increasing telemetry downlink data rates, the start of the twentieth eclipse season, and two orbit correction manoeuvres.
Published: 4 May 2012
Report for period 19 March to 4 April 2012Mission operations of the Herschel space observatory continued nominally during the reporting period, with the spacecraft and subsystems all performing as expected.
Published: 10 April 2012
Report for the period 15 January to 4 February 2012 This reporting period covers three weeks of Venus Express operations, from 15 January to 4 February 2012. It covers routine planned operations at moderate but increasing telemetry downlink data rates, the seventh Atmospheric Drag Experiment campaign, and the raising of pericentre at the end of...
Published: 23 March 2012
Report for period 31 January to 19 March 2012Mission operations of the Herschel space observatory continued nominally during the reporting period, with the spacecraft and subsystems all performing as expected.
Published: 23 March 2012
Report for period 21 November 2011 to 31 January 2012Mission operations of the Herschel space observatory continued nominally during the reporting period, with the spacecraft and subsystems all performing as expected.
Published: 6 February 2012