Status report archive

Status report archive

Report for Period 22 October to 28 October 2006During the reporting period the mission operations have been conducted according to the plan. A commanding test consisting of sending a total of 1600 ping commands was conducted during the pass on DoY 297 at an angular separation of 1.3° from the Sun.
Published: 31 October 2006
Report for Period 15 October to 21 October 2006During the reporting period the mission operations have been conducted according to the plan. The spacecraft has been configured for conjuntion operations during the solar conjunction period, which is planned to end on 9 November 2006. During this period the payload is switched off.
Published: 24 October 2006
Report for Period 8 October to 14 October 2006The reporting period contained a spacecraft hardware safe mode which occurred on DoY 282 04:20 UT.
Published: 20 October 2006
Report for Period 1 October to 7 October 2006During the reporting period the mission operations have been conducted according to the plan. The ground and the space segment performance have been nominal.
Published: 10 October 2006
Overall Mission, Payload, and Science Planning StatusSince the last status report, the Mars Express spacecraft, subsystems and payload continued recording healthy conditions, with the planned Medium Term Plans MTP25 to MTP30 successfully executed.
Published: 10 October 2006
Report for Period 15 September to 6 October 2006The reporting period covers three weeks of active cruise and was dedicated to the preparation and execution of the second Deep Space Manoeuvre (DSM2).
Published: 9 October 2006
Report for Period 24 September to 30 September 2006The reporting period contained a spacecraft hardware safe which occurred on 27 September (DoY 270) at 04.37 UT.
Published: 6 October 2006
Report for Period 17 September to 23 September 2006The reporting period contained a spacecraft hardware safe which occurred on 22 September (DoY 265) at 19:24 UT.
Published: 28 September 2006
Report for Period 1 September to 15 September 2006The reporting period covers two weeks of active cruise for Rosetta. Operations performed during this period included preparation operations for the upcoming Deep Space Manoeuvre and a thermal characterization.
Published: 22 September 2006
Report for Period 10 September to 16 September 2006During the reporting period the mission operations have been conducted according to the plan. The ground and the space segment performance have been nominal.
Published: 19 September 2006
Report for Period 3 September to 9 September 2006During the reporting period the mission operations have been conducted according to the plan. The ground and the space segment performance have been nominal.
Published: 18 September 2006
Report for the period 18 August - 01 September 2006The reporting period covers two weeks of active cruise. Operations performed during this period included the fourth passive payload checkout and a thermal characterisation.
Published: 7 September 2006
Report for Period 27 August to 2 September 2006During the reporting period the mission operations have been conducted according to the plan.The ground and the space segment performance have been nominal.
Published: 3 September 2006
The final days of SMART-1's spectacularly successful mission have seen intense activity including a successful recovery from safe mode as mission controllers manoeuvre the craft into a planned lunar impact at 05:42 UT 3 September 2006.
Published: 2 September 2006
Report for Period 20 to 26 August 2006The reporting period contained a spacecraft hardware safe which occurred on DoY 237 at 18:15 UT. The outage has caused the following impact at mission level: science operations from Safe Mode occurrence until spacecraft recovery to nominal operations (238 11.48) have been skippedUSO switched OFF for about 16...
Published: 30 August 2006
Report for Period 13 August to 19 August 2006During the reporting period the Venus Express mission operations have been conducted according to the plan. The ground and the space segment performance have been nominal.
Published: 22 August 2006
Report for Period 28 July to 18 August 2006The reporting period covers three weeks of active cruise for the Rosetta spacecraft. During this period, telemetry generated during Passive Cruise period was dumped to ground, and some maintenance activities were performed on on-board control procedures (OBCP) and mass memory files.
Published: 21 August 2006
Report for Period 6 August to 12 August 2006During the reporting period the mission operations have been conducted according to the plan. The ground and the space segment performance have been nominal.
Published: 15 August 2006
Report for Period 17 July to 13 August 2006This is the last SMART-1 operations report. The SMART-1 lunar impact will take place on 3 September 2006.The Operations during July have been nominal. All spacecraft subsystems are working well and itis expected not to have any problem until the moon impact.The Star Trackers have behaved well after the...
Published: 14 August 2006
During the reporting period the mission operations have been conducted according to the plan. Theground and the space segment performance have been nominal.
Published: 8 August 2006
20-Apr-2024 09:30 UT

ShortUrl Portlet

Shortcut URL

https://sci.esa.int/p/QwQ71q8