• → European Space Agency

    • About Science & Technology

    • For Public

    • For Educators

    • ESA

    • Science & Technology

    • Venus Express

    • Missions
    • Show All Missions
    • Mission Home
    • Summary
    • Fact Sheet
    • Objectives
    • Mission Team
    • Orbit View
    • Background Science
    • Venus vs Earth
    • Venus Transits
    • Spacecraft
    • 3D Model
    • Instruments
    • Engineering
    • Mission Operations…

      • Launch Vehicle
      • Launch Campaign
      • Launch Phase
      • Cruise Phase
      • Orbit Insertion
      • Operational Orbit
      • ESOC info
      • Status Reports
    • Science Operations
    • Venus Express Science Operations
    • Data Archive
    • Resources
    • News Archive
    • Multimedia Gallery
    • Publication Archive
    • Status Report Archive
    • Calendar of Events
    • Services
    • Contact Us
    • Subscribe
    • Terms and Conditions
    • Bookmark and Share

    No. 79 - Entry into Quadrature

    20 May 2007 12:00

    Report for period 13 May to 19 May 2007

    The Entry in the Quadrature phase with fake ephemeris has been successful. The temperatures of all subsystems are also within limits. In order to perform science during this phase, a 17 hour cooling is required before any S/C communication. This has forced the missing of some of the passes at Cebreros. Not having sufficient passes to uplink all the commands, Venus Express is using, for the first time, the option of "delayed TC files" to store and call the commands on-board at a specific time.

    During this reporting period only three passes were taken and the table below shows a chronology of the main activities for each pass:

    MET (Day) Date DOY VPER# Main Activity
    552 14/05/07 134 388 Routine Mission Operations
    554 16/05/07 136 390 Routine Mission Operations
    556 18/05/07 138 392 Routine Mission Operations

    At the end of the last Cebreros pass in the reporting period (DOY 138, 18:00z) Venus Express was orbiting Venus at 132 million km from the Earth. The one-way signal travel time was 441 seconds.

    Payload Activities

    ASPERA
    The instrument was regularly operated as part of the routine plan.

    MAG
    The instrument was regularly operated as part of the routine plan.

    PFS
    This instrument is OFF and was not operated.

    SPICAV
    The instrument was operated as part of the routine plan.

    VeRA
    Occultation observations were performed over NNO on 2007-134, 2007-136 and 2007-138.

    VIRTIS
    The instrument was regularly operated as part of the routine plan.

    VMC
    The instrument was regularly operated as part of the routine plan.


    Ground Facilities

    During the reporting period Venus Express has been supported by passes with Cebreros every second day.

    Future Milestones

    Swap from HGA 1 to HGA 2 will be performed on DoY 159.
    The quadrature phase operations will extend up to mid June 2007 (DoY 167).


    Last Update: 15 Jun 2007

    • Shortcut URL
    • http://sci.esa.int/jump.cfm?oid=41053
    • Status Reports
    • Archives

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • Google Buzz
    • Livestream
    • Subscribe
    • App Store
    • ESA Science Twitter

    Follow ESA science

    • Copyright 2000 - 2013 © European Space Agency. All rights reserved.

    • Terms and Conditions