• → European Space Agency

    • About Science & Technology

    • For Public

    • For Educators

    • ESA

    • Science & Technology

    • BepiColombo

    • Missions
    • Show All Missions
    • Mission Home
    • Summary
    • Fact Sheet
    • Objectives
    • Background Science
    • Background Science
    • Mercury Interior
    • Mercury Surface
    • Mercury Atmosphere
    • General Relativity
    • Mercury Planetary Orbiter
    • Spacecraft
    • Instruments
    • Mercury Magnetospheric Orbiter
    • Spacecraft
    • Instruments
    • Mission Operations
    • Getting to Mercury
    • Resources
    • News Archive
    • Multimedia Gallery
    • Publication Archive
    • Journal Archive
    • Calendar of Events
    • Services
    • Contact Us
    • Subscribe
    • Terms and Conditions
    • Bookmark and Share

    BepiColombo Mercury mission to be launched in 2015

    28 Feb 2012

    BepiColombo, an ESA mission to the planet Mercury in collaboration with the Japanese space agency, JAXA, is now planned for launch in a window opening in August 2015.

    The BepiColombo spacecraft

    While ESA had previously been targeting a launch in July 2014, a 2015 option has always been built in to the development plan, as part of the risk mitigation strategy.

    Mercury is a planet of extremes, with its very high density, surface temperature, and strong interaction with the solar wind. Understanding its properties and origin will give scientists important insights into the evolution of the Solar System.

    BepiColombo involves a carrier spacecraft and two separate orbiters, one developed by ESA and the other by JAXA, dedicated to a comprehensive exploration of Mercury and its environment.

    So close to the Sun, the spacecraft will have to endure hostile conditions, in particular temperatures reaching over 450 degrees Celsius. A number of new and critical technologies have had to be developed in order for the mission to reach Mercury and operate there. These include the solar arrays, the electric propulsion system, the antenna assemblies, and the complex thermal management system.

    The industrial contractors (led by Astrium GmbH in Friedrichshafen, Germany) working with ESA on the mission have recently assessed the current status of the development of these items and have concluded that the first launch window of July 2014 can no longer be met.

    Launch opportunities of typically one-month duration for BepiColombo are dictated by positions of the Earth, Venus, and Mercury, allowing the spacecraft to follow its intricate interplanetary trajectory. The next launch opportunity to Mercury occurs in August 2015 and is consistent with the projected completion date of the spacecraft, including margins.

    All stakeholders, including the Science Programme Committee and the international partners, have been made aware of the issues affecting the launch date.


    Last Update: 28 Feb 2012

    • Shortcut URL
    • http://sci.esa.int/jump.cfm?oid=50105
    • Images and Videos
    • BepiColombo arriving at Mercury

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • Google Buzz
    • Livestream
    • Subscribe
    • App Store
    • ESA Science Twitter

    Follow ESA science

    • Copyright 2000 - 2013 © European Space Agency. All rights reserved.

    • Terms and Conditions