Currently, sci.esa.int is under review and not being updated. For the latest information and news from ESA science missions and scientific results, please visit esa.int. For a comprehensive overview of ESA’s Science Programme and its missions, please refer to science.esa.int. For in-depth technical information aimed at ESA's scientific communities, you may also wish to consult cosmos.esa.int.

Asset Publisher

Back Preparing for fairing integration

Preparing for fairing integration


Date: 10 May 2009
Satellite: Herschel and Planck
Depicts: Fairing encapsulation
Location: Final assembly building (BAF), CSG, Kourou, French Guiana
Copyright: ESA-CNES-Arianespace / Optique Vidéo du CSG - P. Baudon

This image, taken on 10 May during the fairing installation preparation, shows the Herschel spacecraft standing on the SYLDA 5 support structure that encapsulates the Planck spacecraft at the top of the launcher. The SYLDA 5 is hidden from view by the movable access platform on which personnel are preparing for the fairing installation. Directly below the platform the top of the launcher is just visible.
Last Update: 1 September 2019
14-Feb-2026 16:15 UT

ShortUrl Portlet

Shortcut URL

https://sci.esa.int/s/8Jq2QaW

Also Available As

Related Images

Related Videos

Related Publications

Related Links

See Also

Documentation