Contributions to LISA Pathfinder
The technical team behind LISA Pathfinder involved more than 40 companies and research institutes from 14 European countries and the US. The prime contractor, Airbus DS Stevenage, led the industrial team building the spacecraft, while Airbus DS Friedrichshafen was responsible for providing the integrated LISA Technology Package payload.
The subsystems for the LISA Technology Package were provided by a consortium of European companies, research institutes and ESA. The US contributed the Space Technology 7 (ST7) Disturbance Reduction System payload.
Last Update: 1 September 2019