Final presentation on the TRP contract
Start date: 21 Mar 2001
Address: ESTEC, Noordwijk, Netherlands
The scope of this contract includes the construction of real hardware, on a capacitive inertial sensor serving as a precursor to a LISA flight demonstration model. The contract also covers the design and construction of a torsion balance test equipment.
The study has been performed performed by the University of Trento, with help from RAL, Imperial College, and the University of Birmingham.
Last Update: 1 September 2019